Примеры использования Chayvo на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
Chayvo OPF field response group- 17 persons.
Deployment of response personnel and equipment on the Chayvo Bay shore.
Chayvo is also producing oil and gas from Orlan offshore platform.
Produced water treatment system at Chayvo OPF is intended to remove oil from water.
Chayvo OPF heat supply system is split into process and non-process areas.
For example, every year the herders use the causeway across Chayvo bay to move their herds.
Odoptu-2(North) WS- Chayvo OPF Pipeline Underwater Crossing of Piltun Bay.
Efforts are being currently under way to increase hydrocarbon production at Chayvo.
Chayvo TWSA is arranged on waterproofed foundation, and has a fence and lockable gates.
Odoptu is located 70 km north of Chayvo and is very much different which affected the drilling process.
Upon completion of drilling operations at Odoptu, the Yastreb drilling rig was decommissioned and returned back to Chayvo.
The other two fields- Chayvo and Odoptu- began production in 2005 and 2010, respectively.
Khabarovsk Krai and within the adjacent water areas of the Sea of Okhotsk,including Chayvo Bay and Piltun Bay.
Orlan- Chayvo WS offshore pipeline Benthos The survey found 78 species of benthic aquatic organisms.
Erosion processes are the most common exogenous geological processes in the Chayvo OPF area.
The Produced Water Treatment System at the Chayvo OPF and Odoptu NWS includes the removal of oil from the water.
The Chayvo OPF and Odoptu-2(North) WS produced water treatment systems are designed to separate oil from the water.
Monitoring of exogenous processes along the gas pipeline route in the Chayvo OPF- Boatasino section determined the following.
Chayvo OPF- Berkut platform produced water reinjection pipeline Berkut platform- Chayvo WS full wellstream pipeline.
The spilled oil spread to form an oil slicknear the Orlan platform, drifting towards Chayvo Bay along the shore of Sakhalin Island.
Chayvo OPF- Botasino Gas Export Pipeline Technical and biological remediation was performed along the entire length of the pipeline route.
It happened, for example, when it became apparent that a planned flowline would pass through the sea eagles' nesting area on the shore of the Chayvo Bay.
Construction of a bridge over Chayvo Bay specifically for the needs of the Sakhalin 1 project may serve as a good example of mutually beneficial collaboration.
Work was undertaken in both the Piltun(26 days) andOffshore(8 days) feeding areas as well as in the Chayvo area 4 days.
Sakhalin-1 includes three oil and gas fields- Chayvo, Odoptu, and Arkutun Dagi- located off the northeast coast of Sakhalin Island in the Russian Far East.
The ENL programme is meant to cover approximately 1,600 km2 across that company's Odoptu, Chayvo and Arkutun-Dagi licenses, as well as Rosneft's North-Chayvo license area.
The initial drilling program at Chayvo was completed in 2008 with a total of 20 ERD wells drilled, setting world records in depth, horizontal reach and drilling speed.
Since 2003, a total of 51 extended reach wells have been drilled at Sakhalin-1 to develop both the Chayvo and Odoptu fields, setting records for measured depth five times.
Before major construction activities at Chayvo and Odoptu, university scientists conducted archeological studies of the area which revealed ancient sites dated over 9 thousand years.