Примеры использования Demarcation team на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
The demarcation team shall now fix the position of Points 6 and 9.
At the same meeting, the Commission drew up its first set of technical instructions to the demarcation team.
The demarcation team shall invite Eritrea to prepare a draft boundary for the town of Tserona.
The Commission also referred to technical demarcation issues between Points 17 and 18,which it said would be addressed in future instructions to the demarcation team.
The demarcation team shall then submit that draft boundary to Ethiopia for comment.
Where islands are identified by the Parties in their comments,"the demarcation team shall determine by appropriate methods the position in relation to the main channel of those islands.
The demarcation team shall fix Points 24 and 25 in accordance with Paragraph 14 D of the Demarcation Directions.
Following the receipt, on 11 June 2003, of the parties' comments on the Commission's pillar site assessment survey for the Eastern Sector, the Commission instructed the demarcation team to undertake certain additional field work in that sector.
The demarcation team will submit the Ethiopian proposal for the boundary around the town of Zalambessa to Eritrea for comment.
Both parties must expressly undertake to cooperate with the Commission and its demarcation team in relation to the work to be done in respect of islands, as contemplated in paragraph 21 of the second demarcation instructions.
The demarcation team shall fix the position of Points 15 and 16 in accordance with Paragraph 14 D of the Demarcation Directions.
The Commission also referred to some uncertainty regarding the boundary line around Zalambessa and the commencement of the line passing down the Muna until it meets the Enda Dashim at Point 21 andsaid that it would be giving the demarcation team appropriate instructions in due course.
As of 9 March 2010, the demarcation team had not made any progress since my last report S/2009/31.
With respect to Points 26, 23, and 22, the boundary shall be located at the intersection of the main channel of each tributary with a line joining the upper and lower sections of the permanent bank of the main stream, andshall be marked by the demarcation team with an appropriate pillar site.
Work remains to be done by the demarcation team in relation to certain islands paras. 20 and 21 of the second demarcation instructions.
The boundary following the main channel of the Belesa A and the main channel of the tributary shall be located at the intersection of the main channel of the tributary with a line joining the upper and lower sections of the permanent bank of the Belesa A, andshall be marked by the demarcation team with an appropriate pillar site.
The Commission directed the demarcation team to take full account of the proposed boundaries in the Parties' comments on Tserona and Zalambessa.
The Commission also gave instructions for the identification of the Eritrean claim line referred to in paragraph 8(1)(b)(v) of the delimitation decision; in paragraph 18,required the demarcation team to fix the positions of points 6 and 9; and gave instructions in paragraph 20 regarding demarcation in relation to river boundaries and islands.
The demarcation team shall determine by appropriate methods the position in relation to the main channel of those islands identified by the Parties in their comments.
As indicated in its tenth report,the Commission communicated to the parties on 22 August its instructions to the demarcation team for implementing the plan of work set out in the July 2003 schedule, including preparation of the factual survey of Tserona and Zalambessa and field assessment of pillar sites in the Central and Western Sectors.
The demarcation team shall fix the position of the pillar site as close as possible to Point 29 so as to ensure that both Parties have continuous access to the waters of the Ragali.
The resulting security concerns,including armed obstruction of the work of the demarcation team, have effectively blocked efforts to demarcate the Abyei area border and represent a continuing threat to both the civilian population and intercommunal relations.
The demarcation team shall fix pillar sites at the outer and westernmost tips of the perimeter of the plateau, linked by a series of straight lines traversing the valleys in between.
After considering the parties' comments of 24 January, 15 April and2 May 2003, the Commission issued instructions to the demarcation team for implementing the plan of work set out in the schedule of the order of activities ahead as at 16 July 2003, including preparation of the factual survey of Tserona and Zalambessa and field assessment of pillar sites in the Central and Western Sectors.
The demarcation team shall take the fullest account of the proposed boundaries in the Parties' comments on Tserona and Zalambessa and the instructions in Paragraph 14 E of the Demarcation Directions, and shall prepare a report on these towns.
Further work needs to be done by the demarcation team at Tserona and Zalambessa paras. 3, 8, 12, 13, 14 and 15 of the schedule; paras. 1 and 8-10 of the second demarcation instructions.
The demarcation team shall investigate the area north of the Muna/Berbero Gado in order to determine whether there is a physical barrier affecting access from the north to the northern side of the river that makes the boundary as set out in the Delimitation Decision manifestly impracticable.
Work remains to be done by the demarcation team on the field assessment of pillar sites in the Western Sector paras. 19, 20, 22 and 23 of the schedule; para. 18 of the second demarcation instructions.
The Demarcation Team, after considering these comments, made further adjustments, and presented a final report to the Commission in August 2003. This report set out the coordinates as surveyed of all boundary positions in the Eastern Sector and achieved an almost exact area balance.
Work remains to be done by the demarcation team on the field assessment of pillar sites in the Central Sector paras. 12-15 of the schedule; paras. 2-7 and 11-14 of the second demarcation instructions.