Примеры использования Plant was built на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
The plant was built in a short time.
The first industrial-scale centrifuge plant was built in 3 phases from 1962 to 1964.
The plant was built on the private investor.
In order to efficiency upgrading compliance with environmental law a new electric filter on rotary kiln 2 at the plant was built and switched into operation.
A brick-tiling plant was built in a short time.
Plant was built at the territory of Fergana Mechanical Plant, while total area is 60500 m2, production area- 11 117 m2.
History: The plant was built in 1964.
The plant was built according to a Soviet design and operates four units with VVER-440 reactors.
The state of Jalisco has carried out the following principal measures:at the Inspectorate-General of Ciudad Guzman prison, a wastewater treatment plant was built. The new treatment plant saves water by treating the wastewater for re-use in irrigation of green areas, thereby also reducing the electricity consumption of the equipment that pumps drinking water to the facility.
The plant was built in the framework of the Industrialization Map in 2015.
Recall that the plant was built with the support of Italian investors and will open in late November.
The plant was built as part of the Business Road Map 2020 programme.
In late 1936 a plant was built near Nanking to manufacture binoculars and sniper rifle sights.
The plant was built in the Soviet era, in the seventies of the last century.
The first and largest tidal plant was built in the 1960s at La Rance in France and can generate 240MW of power.
The plant was built from the"zero cycle" with the compliance of the rules of Good Manufacture Practice GMP.
A refrigerator recycling plant was built, and assay laboratory that samples and assays different types of materials was established.
The plant was built and designed from scratch especially for the priority areas of the product portfolio.
This modern processing plant was built in 2011 and qualitatively changed the environmental safety situation of the entire prefecture.
The plant was built using the most advanced technologies in construction and winemaking at the time.
The specular reflector plant was built near Lytkarino in 1934; the territory around it was actively built up with residential quarters in the next years.
The plant was built in 1937 but continues to operate to this day and has simultaneously turned into a living museum.
The plant was built in 1971 and today the production facilities employ 150 people, runs 24/7 and has four production lines.
The steel plant was built near the lake Storsjon, and soon after a town called Sandviken grew around the plant. .
When an aluminium plant was built in Braunau am Inn in 1939/40, the first hard fired stones were produced in Marklkofen for the smelting furnace.
Therefore, the plant was built in the town of Tosno of Leningrad region, the products of which are focused on the domestic Russian market to operate in the severe cold conditions.
The modernized crushed stone plant was built using modern technology, at the production site the latest equipment was installed: crushers of METSO and SANDVIK companies, thanks to them products of the quarry will have consistently high quality.
These coal-fired plants were built throughout the world.
They demanded that a plant be built in Bolivia to process the gas and that domestic consumption had to be met before export.
The entire technological process at the plant is built in such a way as to ensure the most wasteless production and fully utilize raw materials coming to the plant. .