Примеры использования Power transformers на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
The second was The Power Transformers Co.
Power transformers are important electrical equipment in power systems.
The substation has two 40 MVA power transformers.
The test items for power transformers shall include the following.
Requirements for for dry-type large power transformers.
The capacity oftwo power transformers of10/110kVis 80MVA.
This system can be used for both distribution and power transformers.
For today two power transformers of 25 MVA each have already been installed.
When should partial discharge be tested on power transformers?
The power transformers were repaired in penitentiary institution No. 2 in Lipcani.
At the Substation 35/10 kV Budovo two power transformers TC 6300 kVA have been installed.
Water is a threat to the insulation of oil(or ester) insulated power transformers.
The total established capacity of power transformers 6-1150kv made 141 805,9 MVA.
Power transformers are the central hub in the field of energy distribution and transmission.
This will allow to prevent disturbances of power transformers in an infant state.
A further 14 power transformers are also expected to arrive during September and October 1998.
Atthe supply centre the power engineers will install two power transformers of40MVA each.
K-45 Purchase of Power Transformers and Service Parts of Transformers. .
Renovation of Yuzhnaya 110/10 kV substation and installation of 2x40 and 2x25 MVA power transformers.
For high voltage power transformers, the tap changer is used for voltage regulation.
Dielectric tests have been used for decades to diagnose power transformers and bushings.
Power transformers and autotransformers of 1,150-10 kV(8 of them are owned by third parties);
At the substation"Revival" there are two power transformers with a total capacity of 20 MVA(2x10MVA) installed.
For power transformers of different voltage levels, we have different test tests for their implementation.
Therefore, we have developed a wide range of solutions for testing power transformers that operate in line with international standards.
Power transformers replacement works at 110/10 kV„Šiaurinė“ transformer substation, located at P. Lukšio st., Vilnius.
Ventilation and cooling system of switchgear and power transformers and oil-filled equipment and batteries are being checked.
The UPG 620 generates fast pulses for testing a PD measuring circuit in gas-insulated switchgears(GIS) and power transformers.
For medium and large power transformers, the value of the Peak Efficiency Index and the power at which it occurs.
Six substations of35-110kV were comprehensively repaired and ten power transformers of35-110kV were overhauled(previous year- six and eight, respectively).