Примеры использования Team site на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
Team site for 6 to 8 people.
The aggressors left the team site.
Team site support.
The second new team site will be located in Warrap.
Team site for 6 to 8 people.
Displaced Darfurians seeking shelter at UNAMID team site on 2 February 2009.
Team site for 9 or more people.
The second option involved a number of steps,including closing some sector headquarters and a team site.
Team site for 9 or more people.
A group of armed persons attacked the team site with assault rifles and vehicle-mounted machine guns.
The team site will be built during the 2012/13 period using in-house resources.
Regular meetings between Mission Force Commander, team site commanders and parties to the conflict.
The Abyei team site has been replaced by the team site in Diffra.
Replacement of soft-wall accommodation structures with hard-wall containerized accommodation in 1 team site Mijek.
A team site in Sakassou will be redeployed to Daoukro, as will a station from Danane to Boundiali.
Camp/Facilities Management Assistants in support of the Mission's team site concept.
For team site protection/field headquarters protection read team site protection/field office protection.
Government soldiers visited the UNAMID team site just hours before and after the attacks;
Each team site has a support team of five civilian staff members and between two and five substantive civilian staff members.
During the reporting period, 2 sector headquarters(Smara and Dakhla)and 1 team site(Dakhla) were closed.
Static installation security/team site protection/field office protection days 1,976 troops for 365 days.
On 13 July 2013,a platoon-sized TANZBATT7 patrol was attacked about 22 km from the UNAMID team site at Khor Abeche.
In addition, each team site will have workshop capabilities for the maintenance and repair of vehicles.
In Korma(North Darfur), UNAMID enhanced security andconfidence-building patrols around the team site in the light of the influx of newly displaced persons.
Static installation security/team site protection/field headquarters protection days 1,976 troops for 366 days.
In Khor Abeche, South Darfur, following clashes between SLA-MM andthe Abu Bashar militia group, 100 displaced persons fled to the UNAMID team site on 9 January.
Troop-days for force protection and security, team site protection and field headquarters protection days 30 troops per centre for 6 centres for 365 days.
The four Security Assistants in Juba will function as shift supervisors 24 hours a day,seven days a week, for the 20 Security Guards for the Jebel Kujur team site.
This is in addition to the 7,160 people displaced to the team site during the attacks by the Rapid Support Forces in East Korma in the first quarter of 2014.
Although the Sector Headquarters of Dakhla andSmara have been closed as a result of the recently conducted military operational review, a team site in Smara and a liaison office in Dakhla remain.