Примеры использования Tests must на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
The tests must stop.
The first one is that these tests must be written.
Those tests must be flawed.
Secondly, testing of large amounts of memory(for example, more than two gigabytes) takes much time,so it is not expedient because the unit tests must work fast.
All nuclear tests must be prohibited.
Tests must be carried out on a complete refrigeration unit operating as multi-temperature equipment with either 2 or 3 evaporators.
To collect this bounty,all above unit tests must meet the 100% coverage marker except for log statements.
The tests must be made on the points of the tank which are regarded as vulnerable to frontal or rear collisions.
Control devices submitted to the Technical Service conducting the tests must be checked for conformity with the requirements of paragraphs 3 and 4 of this annex.
Such tests must be simple in maintenance, updating and management.
If the tank is only designed for installation on vehicles equipped with a compression-ignition engine, three tests must be carried out with tanks filled with diesel fuel;
Nuclear tests must cease and must cease immediately.
For vehicles powered completely or partially by an electric motor(or motors),permanently connected to the wheels, all tests must be carried out with the motor(s) connected.
Full-scale tests must be carried out in accordance with 15.3.2.
If the tank is designed for installation on vehicles equipped with either a positive ignition engine ora compression ignition engine, three tests must be carried out with tanks filled with premium-grade gasoline;
Nuclear tests must end immediately and end once and for all; that is the demand of the international community.
Brakes and components submitted to the Technical Service conducting the tests must be tested for conformity with the requirements of paragraph 6 of this annex.
The tests must be carried out on a complete operating multi-temperature unit with two or three evaporators.
Substations and transmission lines after new construction, reconstruction, and expansion, andthree-phase circuit nuclear phase tests must be conducted before the line is overhauled and power is transmitted to the user to ensure the phase sequence of the transmission line and the three-phase load required by the user.
The tests must be carried out on a complete operating multi-temperature unit with two or three evaporators.
A large majority, however, preferred to add a note clearly specifying that once the IBC had entered into service it was not necessary for the competent authority of the country of approval to authorize bodies carrying out inspections and tests in other countries, butthat such inspections and tests must be carried out in conformity with the rules specified in the type approval see annex II.
Prenatal and postnatal tests must include breast examinations, and mothers must be taught how to breastfeed.
These tests must be very demanding: the basis must be the existence of fundamental breaches of international humanitarian and human rights law.
In the case of dispute caused by the non-compliance of gas fuelled engines,when using a commercial fuel, the tests must be performed with a reference fuel on which the parent engine has been tested, or with the possible additional fuel 3 as referred to in paragraphs 4.1.3.1. and 4.2.1.1., on which the parent engine may have been tested. .
In the case of dispute caused by the non-compliance of gas fuelled engines when using a commercial fuel, the tests must be performed with a reference fuel on which the parent engine has been tested, or with the possible additional fuel 3 as referred to in paragraphs 4.1.3.1. and 4.2.1.1., on which the parent engine may have been tested. .
However, the test must be conducted by a woman medical specialist.
The test must be wrong.
The test must be conducted in the following conditions.
The test must comprise four phases see appendix 1.
Every test must be repeated.