Примеры использования Well construction на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
A The well construction time was reduced by 15.
Engineering and technology audit of the well construction project.
Using the well construction plan, I will name two.
The second stage of soil surveying on the N-1 well construction site were conducted.
Permits for well construction were obtained from Venezuelan government agencies;
Люди также переводят
Integra offers a complete range of services and products for well construction.
Well construction is a complex technological process, which includes the following stages.
The Group's attributable all-in sustaining costs comprise C1 cash costs plus well construction costs and sustaining costs.
Development of well construction programs for each type of service for each well. .
The experience of«AkvaStroiMontazh» Company proves the growth of using casing made of unplasticised PVC in water well construction in Russia.
This also concerns well construction at low-permeability strata and unstable formations.
In addition to assuming all supervisory functions, the service provider will also coordinate the work of well construction contractors, perform quality checks and monitor the service contractor scope.
ISR well construction The typical construction of an ISR well is shown in Figure 10-6.
In respect of capital costs,it would also be necessary to intensify the well construction rates in advance in order to ensure the timely attainment of the projected increases.
Ii Well construction, such as materials and techniques used, and the location, trajectory and depth of the well; .
Help: Schlumberger(Schlumberger) is a leading global supplier of technologies for integrated assessment modelling of the aquifer, well construction, control the extraction and processing of hydrocarbons.
Design is much cheaper than well construction, and there is no need to twist a contractor's arms.
Includes project-level construction supervision, monitoring of compliance with industrial andoccupational safety rules applicable to well construction activities and monitoring of material consumption rates at the rig floor.
Gelfat took part in the first SPE Seminar:«Well Construction in the North» and also got to pay visits to the USTU Oil and Gas Museum and USTU Polygon.
Reagents for Drilling and Production Business Unit deals with development, individual selection andsupply of a wide range of reagents with complex chemical composition with a high engineering component for well construction and oil production.
Russian-produced equipment was used in well construction, retooled in line with the specific geological conditions of the Novoportovskoye field.
C1 cash costs excluding Mineral Extraction Tax(“C1(exc MET)”); and All in sustaining Costs(“AISC”)comprising the C1 cash costs as well as the production well construction costs and sustaining costs.
Well construction costs which are determined through application of unit construction and equipping costs per unit length(metres) developed.
Prevention and elimination complications,accidents and defective well construction[The text of the]: training manual for university students, students in the master's 21.04.01"Oil and gas business"/ And.
The manager is involved in toolbox meetings, reviews contractor work, submits work optimization proposals, advises on engineering and technology solutions,quality improvement activities and well construction efficiency.
Based on data on well construction, geology, work plan for cementing wells, a list of cementing fleet techniques the following solution was developed.
Prior to starting drilling specialists from the Gazprom Neft Scientific Research Centre developed geo-mechanical modelsof the new-generation wells, subsequently controlling the process of well construction round-the-clock from the Gazprom Neft Drilling Support Centre.
Internal supervising helped increase the well construction tempo, reduce idle time during drilling and significantly improve drilling efficiency.
Mud Logging(ML) is designed to provide well monitoring at all stages of its construction and commissioning in order to study the geological section, achieve high technical and economic performance indicators,reduce failure risks and optimize well construction operations.
IPM is the advanced well construction management technology using special forms, methods and tools for the development and implementation of balanced management decisions.