Приклади вживання The brickwork Англійська мовою та їх переклад на Українською
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
The brickwork is completed by 10%.
Japanese panel under the brickwork.
The brickwork is on floors 18-21.
Finishing a country house under the brickwork.
The brickwork is on the 8th floor.
Wall decor under the brickwork looks very interesting.
The brickwork of the external walls is 100% complete.
In the process of filament metal expands and can destroy the brickwork.
In addition, the brickwork of the walls is preserved.
But it is suitable only in a spacious room, a small one, the brickwork will only“eat”.
The brickwork is 100% completed on the 14th floor, inclusive.
Decorating the walls under the brickwork gives the interior a patina of antiquity.
Accurate two-story building faced with brown metal siding,which successfully imitates the brickwork.
To highlight how the brickwork require additional lighting.
Coating the brickwork with an silicone hydrophobic agent prevents efflorescence(salt traces).
Also in the basement there is a largeroom with a fountain at the center with solid columns and the brickwork of the ceiling attracts the attention of the visitor.
Work on the brickwork on the first and sixth floor section 404- 100%.
Ceramic tiles hog imitates the brickwork, or simply has convex rectangular elements.
The brickwork is 90% complete(the brickwork of the partition walls for the cabinets remains).
Do not make the outer chamfer between the barrel and the brickwork from the solution- this will worsen the heat transfer from the heated surface of the barrel.
To this end, the brickwork is covered with white paint, and the emphasis is on the kitchen apron.
First, the brickwork of each floor built on steel girders, which in turn handed efforts on steel columns.
Work is underway on the brickwork on the first and second floors of section 404.
Note that the brickwork is visuallyIncreases the volume of rooms, and white accents bring a note of grace and even some chic.
Work is underway on the brickwork from the first to the sixth floors of section 404.
In this case, the brickwork in the kitchen in the open air is very appropriate because of consumer properties of the material.
If the plaster is applied to the brickwork, and the temperature in the room exceeds 23° C, then its base should be thoroughly moistened.
Calculating the number of solution to the brickwork can be made using the online calculator,in seconds which most accurately defines the amount of the solution on the brickwork.