英語 での Load device の使用例とその 日本語 への翻訳
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
-
Programming
Limit load device are fitted.
This is a spacesaving equipment where power of AC load device can be reused.
To control load devices as supplied by the user.
Attach the drive device to the"drive side" so that the load device is located on the opposite side.
Unit load device of aviation, components for aerospace and aviation.
This is space-saving AC load device where power can be reused.
The load device has several parameters to modify for different simulations.
As shown in the figure above, the voltage at the power supply pin on the load device simply behaves according to Ohm's Law.
Namely that at 100%, the load device I think, all phones of the moment, at least once.
Voltage accuracy is used to verify that the minimum andmaximum values of the ripple voltage are within the accuracy required by the load device.
First select the load device and then right-click on it.
The tester is equipped with electronic preset batch counter,timer and pooled sample clips and load device(compatible with international testing standards).
Short Circuit When the load device is short circuited, cut off the input power.
Of course, even if the ripple voltage is as intended in the design, if the voltage doesnot ultimately satisfy the accuracy requirement of the load device, the design must be reconsidered.
With comparisons to a load device which contains passive components such as resistance and reactor, the installation space is significantly reduced.
The following equipment was provided to elementary schools and evacuation centers:100kW L-10 load device(for heating)×2, and one each of 75kVA, 150kVA, and 500kVA generators.
When the voltage on the load device power supply pin is sensed(as indicated by the blue arrow), because the voltage on the load device power supply pin is controlled so that it remains at 1.8V, that voltage is maintained irrespective of the load current.
Consequently, when checking the load regulation,it is important to verify whether the voltage on the power supply pin of the load device is within a required accuracy level.
The load regulation evaluated on the power supply pin of the load device is equal to the power supply characteristic plus a voltage drop due to line resistance from the power supply output pin to the power supply pin of the load device. .
Air cargo handling- Moving Air Cargo between Pallets and/or Containers- Piab Air cargo handling- moving air cargo between pallets and/or containers Situation Air cargo is transported around the world in cargoplanes that are typically loaded with ULDs(Unit Load Device) or container and cargo pallets.
Similarly, the battery discharge currentis monitored for fuel-gauging/active power management on the load device when the AC adapter is not available and battery capacity needs to be conserved.
In addition to an oscilloscope and a load device, a current probe is also necessary to measure the load current waveform.<Conditions to Check<・ Input voltage: Minimum, Maximum・Load current: Minimum Maximum, Minimum Maximum・Environment: Upper and Lower limits of temperature condition When the load is switched continuously, a waveform like that seen in the lower-left waveform diagram should be observed.
The figure below illustrates the operation of a 1.8V output power supply unit, where the voltage on a powersupply output pin is sensed or a load device power supply pin is sensed, in terms of a voltage on the load device power supply pin with respect to the load current, assuming a line resistance of 0.1Ω.
If the voltage on the power supply output pin is sensed(indicated by the red arrow) in a condition in which little line resistance exists, on the power supply output pin a 1.8V level is maintained.However, on load device power supply pins a voltage drop that is equal to load current x line resistance occurs, as would be expected.
The 5th USB Power loading device.
Power steering G/B rack loading device.
Attach the loading device to the delivery sheath.
Loading device: mechanical loading to move the bridge crane inside the building.
Slot specifications 48 slots(maximum 14,400 loaded devices).
Further, the dryer the driedraw material is fed into the hopper loading device Fast pyrolysis reactor.