Examples of using Measured value in English and their translations into Czech
{-}
-
Colloquial
-
Official
Primary measured value Float position.
IFC 100: down to 0.3% of the measured value± 1 mm/s.
Primary measured value Flow velocity.
Peak value Pressure Current measured value.
Secondary measured value Volume flow.
Wait again for 10 s and note down the second measured value.
Only the last measured value will be deleted.
Any change in the ambient pressure changes the measured value.
Holding/Copying a Measured Value see figure D.
The measured value is displayed in the result line b.
X briefly: the symbol and the last measured value are displayed.
Primary measured value Number of separated vortices.
Any alarms are launched based on the highest measured value.
ASDU-11(M_ME_NB_1) Measured value with with measure.
Each entry contains a time stamp as well as the respective measured value.
The first measured value is shown at the top of the display.
The measurement is affected, but the measured value is still valid.
The current measured value is displayed in the result line b.
Measurement uncertainty: pipe OD>75 mm:± 2% of measured value.
Additional LCD, measured value and/or flow counter.
The device then switches to measuring mode andindicates the current measured value.
The last measured value remains indicated in the result line b.
The defined length and the current measured value are thereby displayed.
The current measured value is displayed on a 3-digit LED display.
Special function: Adjusting the constant A measured value can be adjusted.
The measured value d and the indicator for a changed zero point i flash.
Use the arrow keys to enter the measured value and push ENTER.
Typically, the measured value appears after 0.5 seconds and latest after 4 seconds.
The binding can be used to connect it to the measured value of the same data structure.
The measured value, setting, tilt and instrument status can be viewed on the display.