Successive Umoja annual releases, including Umoja Extension 2.
另外,"团结"项目第二推广阶段的设计蓝图和基线配置(剩余流程)也将完成,准备建设。
Also, the design blueprint and baseline configuration of Umoja Extension 2(the remaining processes) will be complete and ready for build.
第二推广阶段将于2017和2008年分两个连续的年度单元部署。
Umoja Extension 2 will be deployed in two successive annual releases, in 2017 and 2018.
(f)高级研究中心将负责团结项目第二推广阶段的构建和部署,在2017年和2018年发布。
(f) The centre of excellence would be responsible for building anddeploying Umoja Extension 2, to be released in 2017 and 2018.
但应指出的是,团结项目第二推广阶段要作出大量努力,才能在2015年敲定"蓝图"。
It should be noted, however, that Umoja Extension 2 will require considerable effort in order to finalize the" blueprint" in 2015.
第二推广阶段的功能规格和蓝本要结合成立阶段和第一推广阶段的功能进行重新评估。
Umoja Extension 2 functional specifications and prototypes will need to be reassessed in the light of existing Foundation and Umoja Extension 1 functionality.
因此,经充分协商和排定优先次序后,"团结"项目第二推广阶段将分为两个连续的年度单元实施。
Therefore, Umoja Extension 2 would be implemented in two successive, annual releases, after thorough consultation and prioritization.
团结项目组继续与各部门和办事机构密切合作,以完善第二推广阶段的所需功能。
The Umoja team continues to work closely with departments andoffices to refine requirements for Umoja Extension 2 functionality.
After Umoja Extension 2 is fully deployed and stabilized, a potential $60 million to $80 million of additional quantitative benefit could be realized, reaching a combined benefit of anywhere between $140 million and $220 million in 2019.
Umoja Extension 2 to be deployed in two successive annual releases to allow for a focus on the Foundation and Umoja Extension 1 build, test and deployment phases.
As indicated above, the Umoja Extension 2 phase encompasses the more complex processes and those that are more challenging to implement in terms of change management, harmonization and business transformation.
Umoja Extension 2, consisting of 133 business processes, with functionality related mainly to supply chain management, budget formulation and programme management, will be released in early 2017.
Full Umoja Extension 2 functionality will be released in early 2017 and will be completed by December 2018, with the roll-out schedule and clusters yet to be defined.
Recalling the limitations around the absorption of change in the Secretariat, referenced in paragraph 17 above,it is now planned that Umoja Extension 2 would be implemented in two successive, annual releases.
The support team will be the successor entity to the Umoja project following the build,test and release of the Umoja Extension 2 solution within the Secretariat in early 2017.
团结项目第二推广阶段启动后的未来支助小组.
Future support team after the release of Umoja Extension 2.
推广阶段分为两个功能子群:第一推广阶段和第二推广阶段。
Extension divided into two subsets of functionality: Umoja Extension 1 and Extension 2.
第二推广阶段的最后蓝图现已完成大约40%,预定在2015年12月全部完成。
The final blueprint for Umoja Extension 2 is now approximately 40 per cent complete and is due for completion in December 2015.
(d)团结项目第二推广阶段的设计将至迟于2015年12月完成;.
(d) The design of Umoja Extension 2 would be completed by December 2015;
构成团结项目第二推广阶段的133个流程的最后设计工作也已取得进展。
Progress was also made on the finaldesign of the 133 processes constituting Umoja Extension 2.
团结"项目第二推广阶段工作将于2015年下半年开始,其中包括会议和活动管理流程。
Work on Umoja Extension 2, which includes conference and event management processes, will begin in the second half of 2015.
由此,"团结"项目的功能范围可分为三部分:成立阶段、第一推广阶段和第二推广阶段。
The functional scope of Umoja would henceforth be divided into three parts: Foundation,Extension 1 and Extension 2.
行预咨委会还建议,请秘书长为以较低成本加快交付项目,包括第二推广阶段,寻找所有选项。
It further recommended that the Secretary-General should be requested to seek all options for accelerating the delivery of the project,including Extension 2, at a lower cost.
行预咨委会因此感到关切的是,过早解散项目工作组会带来无法有效实施第二推广阶段的风险。
The Advisory Committee was therefore concerned that the prematuredismantling of the project team presented risks that Extension 2 would not be implemented effectively.
委员会还建议,请秘书长寻求以较低成本加快交付项目包括团结项目第二推广阶段的所有选项。
The Committee further recommends that the Secretary-General be requested to seek all options for accelerating the delivery of the project,including Umoja Extension 2, at a lower cost.
Expresses its ongoing concern about delays in project implementation and the projected additional fundingrequirements to carry the project through to the full implementation of Umoja Extension 2;
The build and test phase is scheduled to commence in 2016,and Umoja Extension 2 functionality will be released within the Secretariat beginning in early 2017 and is to be completed by December 2018.
Foundation, plus Umoja Extension 1 deployment and design of Umoja Extension 2, plus preliminary estimated contracted services of $30 million for the build phase of Umoja Extension 2 and deployment to a pilot.
The increase of $8,085,600 in the requirements under contractual services reflects the refined projections of the outsourced expertise and capacity required for the completion of the build of Extension 1 andthe design of Extension 2 in 2015;
English
Bahasa indonesia
日本語
عربى
Български
বাংলা
Český
Dansk
Deutsch
Ελληνικά
Español
Suomi
Français
עִברִית
हिंदी
Hrvatski
Magyar
Italiano
Қазақ
한국어
മലയാളം
मराठी
Bahasa malay
Nederlands
Norsk
Polski
Português
Română
Русский
Slovenský
Slovenski
Српски
Svenska
தமிழ்
తెలుగు
ไทย
Tagalog
Turkce
Українська
اردو
Tiếng việt