D Cost estimates for 2005/06 are inclusive of a 25% vacancy rate for international staff positions and an average 10% vacancy rate for national staff positions.
以下的费用估计数表明,增设的分庭本身所需经费一年不到120万美元。
The cost estimate below indicates that the additional Chamber itself will require an expenditure of less than $1.2 million per annum.
购买2977辆车的费用估计数的细节已载于A/54/494和Corr.1号文件的附件二C中。
The cost estimates provided for the purchase of 2,977 vehicles, as detailed in annex II C of document A/54/494 and Corr.1.
个临时职位的费用估计数考虑到了50%的空缺率。
The cost estimate for the 324 temporary positions takes into account a vacancy factor of 50 per cent.
B2005/06年的费用估计数含6%的出缺率,而2004/05年适用的出缺率为10%。
B Cost estimates for 2005/06 are inclusive of a 6% vacancy rate compared to a 10% vacancy rate applied in 2004/05.
该两年期的费用估计数为18300美元,将通过自愿捐助满足。
The estimated cost for the biennium, amounting to $18,300, would be met through voluntary contributions.
C2005/06年的费用估计数含2%的出缺率,而2004/05年基于全额部署。
C Cost estimates for 2005/06 are inclusive of a 2% vacancy rate compared to a full deployment applied in 2004/05.
塞尔维亚政府已提出了贝尔格莱德所持地籍记录拷贝项目的费用估计数,由欧洲联盟供资。
The Government of Serbia has provided a cost estimate for a project, to be funded by the European Union, to make copies of cadastre records held by Belgrade.
如上所述,2009年拟议建筑计划的费用估计数为3558300美元,包括以下项目:.
The estimated cost of the proposed construction plans for 2009 amounts to $3,558,300, as indicated above, and would include the following projects:.
C2006/07年期间的费用估计数含2%的出缺率,与2005/06年期间适用的出缺率相同。
C Cost estimates for 2006/07 are inclusive of a 2% vacancy, the same as the vacancy rate applied in 2005/06.
年3月已经向大会报告过,完成基本建设总计划的费用估计数增加了1.489亿美元。
As reported to the General Assembly in March 2012, the estimated cost to complete the capital master plan increased by $148.9 million.
该建议列入了关于这一进程的费用估计数,供缔约方大会第二届会议审议。
The proposal includes cost estimates on such a process for consideration by the Conference of the Parties at its second meeting.
下文表6列示完成基本建设总计划项目的费用估计数。
The estimated cost to complete the capital master plan project is presented in table 6 below.
C2006/07年的费用估计数包括10%的延迟部署因素,与2005/06年一样。
C Cost estimates for 2006/07 are inclusive of a 10 per cent delayed deployment factor, the same as in 2005/06.
加上2012年递延的资源54000美元,目前预计这项活动的费用估计数为160000美元。
When combined with deferred resources from 2012 of $54,000, the estimated cost of this activity is now forecast to be $160,000.
咨询委员会经了解获知,拟议的900000美元所需经费的提出仅基于一家公司提供的费用估计数。
The Advisory Committee was informed, upon enquiry,that the proposed requirements of $900,000 are based on cost estimates provided by just one company.
这些按照既定标准计算的费用估计数于2002年将达到269100美元。
These costs, estimated on the basis of established standards, would amount to $269,100 for 2002.
处理该案所需的费用估计数为2368300欧元,详见附件九。
The estimated costs required to deal with it are detailed in annex IX and amount to Euro2,368,300.
委员会相信,有效地利用这些服务将有助于减少联刚特派团在别的地方的费用估计数,包括订约承办的事务。
The Committee trusts that an effectiveuse of these services will help to reduce the costs estimated elsewhere for MONUC, including services provided on a contractual basis.
中文
Bahasa indonesia
日本語
عربى
Български
বাংলা
Český
Dansk
Deutsch
Ελληνικά
Español
Suomi
Français
עִברִית
हिंदी
Hrvatski
Magyar
Italiano
Қазақ
한국어
മലയാളം
मराठी
Bahasa malay
Nederlands
Norsk
Polski
Português
Română
Русский
Slovenský
Slovenski
Српски
Svenska
தமிழ்
తెలుగు
ไทย
Tagalog
Turkce
Українська
اردو
Tiếng việt