The risk in the project is in the acceptable limit.
这种不确定性就是项目的风险所在。
It is this uncertainty that constitutes risks to the project.
这种不确定性就是项目的风险所在。
These uncertainties are risks to the project.
如果项目的风险很大,就会降低生产高质量软件的可行性。
If project risk is great the feasibility of producing quality software is reduced.
利用Navigator,您可以在项目的整个生命周期内更快地做出更明智的决策,并降低项目的风险。
With Navigator, you can make better decisions, faster throughout the lifecycle of a project,while reducing project risk.
因此,项目的风险主要来自于推广执行过程,而不会存在技术壁垒或产品缺乏市场适应性。
Thus, the project risks are only in the execution and not in the technical barriers or lack of product-market fit.
这大大降低了项目的风险,特别是为临时办公空间(周转办公楼)支付过多租金的风险。
This has significantly reduced the risks of the project, in particular the risk of paying for excess rents in temporary office space(swing space).
你必须运用各种的方法和技巧来减少项目的风险,这其中就包括在每个项目中使用敏捷方法。
You must take advantage of all practices and techniques to reduce your project's risk, including considering agile techniques for every project.
如果我现在说“我们应该尽早找到项目的风险”时,每个人都会赞同,因为这显然是正确的。
Now when I say things like,"We should de-risk a project early," everyone will nod their head because it's just so obviously true.
国家方案内项目的风险较低,而且存在着这样一种趋势。
There would be less risk for projects embedded in national programmes and there is movement in that direction.
招标文件最好说明,订约当局期望如何分担项目的风险。
It is advisable that the bidding documents provide some indication ofhow the contracting authority expects to allocate the project's risks.
行预咨委会关切地指出,差异造成成本增加及预算应急款的大量消耗,从而提高了项目的风险。
The Advisory Committee notes with concern that the discrepancies have resulted in increased costs and substantial depletion of the budgeted contingency,thereby increasing therisk to the project.
由于这一主要原因,应急数额从191186美元增至421301美元,为减轻项目的其他风险留出了余地。
This was the primary factor in the increase in the contingency amount from $191,186 to $421,301,creating leeway to mitigate further risks to the project.
The project risk increased as a result of the high number of legacy systems(25) and global sites(160) that consolidated and integrated with the introduction of Atlas.
While Continuous Integrationcan be extremely effective at reducing risks on a project, it requires a greater emphasis on your day-to-day activities related to coding.
中文
Bahasa indonesia
日本語
عربى
Български
বাংলা
Český
Dansk
Deutsch
Ελληνικά
Español
Suomi
Français
עִברִית
हिंदी
Hrvatski
Magyar
Italiano
Қазақ
한국어
മലയാളം
मराठी
Bahasa malay
Nederlands
Norsk
Polski
Português
Română
Русский
Slovenský
Slovenski
Српски
Svenska
தமிழ்
తెలుగు
ไทย
Tagalog
Turkce
Українська
اردو
Tiếng việt