BATAN Meaning in English - translations and usage examples

Noun
Adjective
bridges
jembatan
anjungan
jambatan itu
pelantar
jambatan
merapatkan
bridge
jembatan
anjungan
jambatan itu
pelantar
jambatan
merapatkan
batan

Examples of using Batan in Malay and their translations into English

{-}
  • Colloquial category close
  • Ecclesiastic category close
  • Computer category close
Batan, Maam.
To Batan, ma'am.
Presint 5 jam batan ini.
Precinct 5 this bridge.
Berikut 5 jam batan yang paling mengagumkan di dunia.
Here are the 5 most amazing bridges in the world.
Bagaimana anda pulang?- Batan, Maam.
How do you go home?- Batan, Maam.
Inilah 10 jam batan gantung paling berbahaya di dunia.
Here are 20 of the most dangerous hanging bridges in the world.
Meteoroid ialah ketulan kecil batu- batan atau.
METEOROID A meteoroid is a little rocky or perhaps…….
Terdapat 23 jam batan utama di Sydney.
There are 23 major bridges within Sydney.
Jambatan Batang Sadong adalah sebahagian daripada 11 jam batan baharu di Sarawak, dengan sebahagian besarnya sedang dalam pembinaan membabitkan peruntukan Kerajaan Persekutuan dan kerajaan negeri.
The Batang Sadong Bridge was one of 11 new bridges built in Sarawak, with the majority still under construction, involving allocations from both the federal and state governments.
Rasa2nya, ada lebih dari 2000 jam batan di kota New York.
By the way, there's over 2,000 bridges in New York City.
Daripada 4 jam batan, Sungai Raia adalah jambatan pertama yang akan disiapkan.
Out of the 4 bridges, Sungai Raia is the first bridge to be completed.
Rasa2nya, ada lebih dari 2000 jam batan di kota New York.
By the way, there are over 2000 bridges in New York city.
Ia merupakan jambatan yang paling panjang antara 8 jam batan yang ada di Atlantic road.
It is the longest of the eight bridges that make up the Atlantic Road.
Sama sekali kereta api melalui 55 terowong dan lebih 196 jam batan dalam perjalanan dari Chur ke Tirano.
Altogether the train passes through 55 tunnels and over 196 bridges on its way from Chur to Tirano.
Ia merupakan jambatan yang paling panjang antara 8 jam batan yang ada di Atlantic road.
The Storseisundet Bridge is the longest of eight bridges on the Atlanterhavsveien.
Agensi berita Bloomberg melaporkan China, sejak 2007 hingga 2012,telah mengalami sekurang-kurangnya 18 jam batan runtuh yang mengakibatkan 135 kematian.
In a five year period between 2007 and 2012,China experienced at least 18 bridge collapses resulting in 135 deaths according to the news agency Bloomberg.
Camilla" memusnahkan 120 jam batan, pautan pengangkutan terganggu kerana pokok-pokok ditebang di jalan raya.
Camilla" destroyed 120 bridges, transport links were disturbed due to trees felled on the roads.
Jalan keretapi ini mendaki dari ketinggian 30 meter di atas paras laut sehingga mencecah 2, 216 meter,mempunyai 49 terowong dan 77 jam batan, dan melalui satu laluan merentasi berbagai jenis iklim dan bentuk muka bumi.
The railway climbs from 30 meters above sea level to 2,216 meters,has 47 tunnels and 72 bridges, and passes through a cross-section of climates and terrain types.
Ia juga mempunyai 5 jam batan casis tanah penuh dan kaki berbentuk H untuk memenuhi keperluan pelanggan untuk pelbagai tapak pembinaan.
It also has 5 bridge full ground chassis and H-shaped legs to meet the needs of customers for various construction sites.
Katanya, berkata projek mega berbilion ringgit seperti Menara Berkembar Petronas,2 jam batan di Pulau Pinang dan' jambatan bengkok' yang gagal, semuanya dibina di Semenanjung.
He added multi-billion ringgit mega-projects such as the Petronas Twin Towers,the two Penang bridges and the failed“crooked bridge” were all built in the peninsula.
Kereta api pas 32 jam batan- termasuk Kylling Bridge yang terkenal, 59 meter di atas sungai Rauma yang- dan melalui 6 terowong.
The train passes 32 bridges-- including the famous Kylling Bridge, 59 meters above the Rauma river-- and passes through 6 tunnels.
Untuk keseluruhan projek Pan Borneo Sarawak yang dijangka siap sepenuhnya pada Jun 2021,beliau berkata ia melibatkan pembinaan 115 jam batan, 25 persimpangan bertingkat, tiga kawasan Rehat dan Rawat serta enam hentian.
The entire Sarawak Pan Borneo Highway project, which is scheduled to be completedby June 2021, involves the construction of 115 bridges, 25 elevated interchanges, three rest and service areas and six lay-bys.
Paling utama ialah pembinaan sebanyak 383 jam batan kecil di seluruh negara untuk merancakkan lagi perhubungan antara kawasan terpencil dengan bandar-bandar utama.
Chief among these will be the construction of 383 small bridges throughout the country to enhance connectivity between rural areas.
Untuk keseluruhan projek Pan Borneo Sarawak yang dijangka siap sepenuhnya pada Jun 2021, beliau berkata,ia melibatkan pembinaan 115 jam batan, 25 persimpangan bertingkat, tiga kawasan Rehat dan Rawat serta enam hentian.
The overall Pan Borneo Highway project in Sarawak is expected to be fully completed in June 2021,involving the construction of 115 bridges, 25 elevated interchanges, three rest and service areas, and six lay-bys.
Pengerusi komuniti Batan, Ogugu Dickson, menambah: Kami mendengar tiga letupan pada kira-kira 10 malam semalam dan pagi hari ini, kami telah menghantar pasukan pengawasan saliran paip untuk memeriksa dan mengesahkan butiran insiden tersebut.
The chairman of the Batan community, Ogugu Dickson, added:“We heard three blasts at about 10:00 pm last night and this morning(Tuesday) we sent out the pipeline surveillance team to go and confirm details of the incident.
Jalan telah disekat dan 84 jam batan di kawasan yang terjejas akibat banjir.
Roads had been blocked and 84 bridges in flood-stricken areas affected.
Selepas penyediaan reka bentuk untuk projek ini, pejabat Loste di Paris, bersama dengan jurutera kanan Peter Saluz, mengambil alih perancangan terperinci, yang berdasarkan rancangan Prof Hennings.[ 2] Pada tahun 1907, sebuah projek akhirnya dipersembahkan, yang menyediakan garis sepanjang 49. 5 kilometer dengan sejumlah 17 terowong dan55 jam batan utama.
After the preparation of designs for this project, the Loste office in Paris, together with senior engineer Peter Saluz, took over the detailed planning, which was based on the plans of Prof. Hennings.[2] In 1907, a project was finally presented, which provided for a 49.5 kilometre line with a total of 17 tunnels and55 major bridges.
Perjalanan ke arah timur dariZermatt, sehari suntuk itu meliputi perjalanan 91 terowong dan 291 jam batan kerana ia bergolek alpine padang rumput lalu selatan Switzerland, murni tasik gunung, dan dusun sempurna gambar.
Traveling eastward from Zermatt,the day-long trip covers 91 tunnels and 291 bridges as it rolls past southern Switzerland's alpine meadows, pristine mountain lakes, and picture-perfect hamlets.
Banyak kali kita dapat mendengar 80 tingkap jambatan rusak, 100 jam batan jambatan rusak, 115 jam batan jambatan jambatan yang rusak, dan sebagainya, tetapi bilangan peniaga atau pengguna yang baru saja memasuki industri pintu dan tingkap bukanlah 80, 100, 115.
Many times we can hear 80 broken bridge Casement Windows, 100 broken bridge casement windows, 115 broken bridge casement windows, etc., but the number of dealers or consumers who have just entered the door and window industry is not 80, 100, 115.
Beberapa daripada 41 stesen dan perhentian, 39 terowong, 8 galeri avalanche,41 jam batan, 78 daripadanya bersejarah, 1054 pembetung, 3 underpass dan 2 overpass telah dipulihkan, beberapa telah diubah suai sepenuhnya.
Some of the 41 stations and stops, 39 tunnels, 8 avalanche galleries,41 bridges, 78 of which are historical, 1054 culverts, 3 underpasses and 2 overpasses have been restored, some have been completely renovated.
Peringkat pertama, yang dijalankan oleh sebuah konsortium syarikat tempatan dan antarabangsa,bermula dengan pembinaan 130 jam batan dan 850 saluran air, iaitu proses melibatkan kira-kira 150 juta meter padu pasir dan batu dipindahkan untuk menyediakan laluan bagi kereta api tersebut.
The first stage, which was carried out by a consortium of national and international companies,started with the construction of 130 bridges and 850 water channels, a process in which some 150 million cubic meters of sand and rocks were removed to prepare the route for the train.
Results: 43, Time: 0.0196

Batan in different Languages

Top dictionary queries

Malay - English