For acetylene cylinders, with the.
Use of fusible plugs in acetylene cylinders.
Acetylene cylinders- Basic requirements and definitions.
OCTI/RID/GT-III/1998/45(France) Marking of acetylene cylinders.
Acetylene cylinders shall not be fitted with fusible plugs.
Transportable gas cylinders- Porous masses for acetylene cylinders.
Acetylene cylinders in capacity of 40 litres are made of a mark steel- 30ХГСА.
Transportable gas cylinders- High porosity porous masses for acetylene cylinders.
Transportable gas cylinders- Acetylene cylinders- Basic requirements and definitions.
The following standards apply for the design, construction and initial inspection andtest of UN acetylene cylinders.
Gas cylinders- Acetylene cylinders- Periodic inspection and maintenance ISO 10462:2013.
Transportable gas cylinders- Periodic inspection andmaintenance of dissolved acetylene cylinders.
Portable gas cylinders- dissolved acetylene cylinders- check at time of filling.
For acetylene cylinders, with the agreement of the competent authority, the date of the most recent periodic inspection and the stamp of the body performing the periodic inspection and test may be engraved on a ring held on the cylinder by the valve.
Sentence on 10 year retest for acetylene cylinders deleted as redundant with“h” of P200.
There has been similar experience in North America and the UN Working Group which is developing proposals Class 2 receptacles andMEGCs has given the period between inspections for acetylene cylinders as 10 years, recognising that MPMs are the norm.
Gas cylinders- Acetylene cylinders- Filling conditions and filling inspection ISO 11372:2010.
Transportable gas cylinders- Filling conditions for single acetylene cylinders including list of permissible porous masses.
For acetylene cylinders, with the agreement of the competent authority, the date of the most recent periodic inspection and the stamp of the expert may be engraved on a ring affixed to the cylinder when the tap is installed, and rendered immovable without dismantling the tap.
In recognition of this, industrial gas companies are specifying MPMs for all new acetylene cylinders and this form of mass is the norm for the industry.
Technical characteristics of acetylene cylinders: Diameter of the cylinder of 219 mm; Capacity of 40 l; Height of 1350 mm; Weight of a cylinder of 90 kg; Volume of gas of 5,5 cubic metres; Solvent: acetone; Gas-filling 7,5 kg; the Maximum pressure of gas at +20 degrees of Celsius 2,3 MPa.
The representative of EIGA explained the involvement of his organization in the first three items,all of them related to acetylene cylinders and expressed its intention to take the lead in resolving the issues.
For acetylene cylinders, with the agreement of the competent authority, the date of the most recent periodic inspection and the stamp of the expert may be engraved on a ring affixed to the cylinder when the valve is installed and which is removable only by disconnecting the valve from the cylinder. .
The CEN standard prEN 12863"Transportable gas cylinders- Periodic inspection and maintenance of dissolved acetylene cylinders" is currently under development and being prepared for the formal vote.
The last paragraph of this section(6.2.1.7.7) specifies that, for acetylene cylinders, the date of the most recent periodic inspection and the stamp of the expert may, with the agreement of the competent authority, be engraved on a cylinder ring. This ring is fitted when the valve is installed and can be removed only by disconnecting the valve from the cylinder. .
Regarding point 3.1 of the report, the Joint Meeting noted that six questions((i) to(vi)) should be dealt with in greater detail,notably concerning acetylene cylinders, but that certain of the questions should be discussed at the level of the UN Sub-Committee of experts.
Transportable gas cylinders- Acetylene cylinders- Basic requirements, definitions and type testing.
This proposal seeks to enable such cylinder rings tobe used for all reusable pressure receptacles, not just for acetylene cylinders, thus ensuring less manual handling and making it easier to identify when a cylinder needs to be inspected, both of which would increase safety measures.
Executive summary: This proposal clarifies the maximum period between inspections for acetylene cylinders and aligns the text with decisions made by the UN Working Group currently developing provisions for Class 2 receptacles and MEGCs.
Amend the end of the sentence before the table as follows:"… andtest of UN acetylene cylinders, except that inspection requirements related to the conformity assessment system and approval shall be in accordance with 6.2.2.5.