Примеры использования Front wall на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
Xxx Front wall.
Read operation manual Front wall.
View of the front wall of the rear.
Read the operation manual Front wall 2.
The front wall(2) is the trailer's protective element.
E 2: at 2/3 of interior behind front wall.
Reinforcement of the front wall 300 m x 3 m height.
Forward- the load is shifted towards the front wall.
Front wall with large feed hatch and free head compartment for the horse.
Additionally, the bunker front wall folds upward.
The compressed air tank is located on the bunker front wall.
On the front wall is mounted basic equipment for hydroponics.
The electronics were placed in the front wall below the screen.
The subassembly is mounted on the load platform planks behind the chassis front wall.
A window is formed in the front wall of the jaw and the window is opened;
Turn the adjuster of the air inlet valve in the front wall to the left.
Optional front wall and lamps, optional half row cab; single row.
The loading surface, including the front wall, shall be continuous.
Optional new front wall and front lights, optional bumpers.
With the optional chassis loading doors and new front wall under the mask.
The front wall and roof combat casemates were made with the use of armor plates.
Optional chrome tank mask is not semi-chrome tank mask, front wall, steel wheels.
On the front wall of the van mounted telescopic mast with power floodlights.
Choose correct combustion head lenght according to the boiler front wall thickness L6.
The front wall of the altar dais is decorated with a pattern of squares and diamonds.
The cinema is equipped with four powerful subwoofers mounted in the front wall and the bar behind the chairs.
The front wall of the left ventricle, fed by the descending branch of the left coronary artery.
Made of a back wall andtwo side walls, no front wall to allow for the silage to be removed.
Front wall of the panel has the special preparation on the internal and also external surface.
Rotation speed of conveyors(1),(2) and(3) is dependent on the setting of gear wheel lever on front wall of load box.