Примери за използване на Adequacy assessments на Английски и техните преводи на Български
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Computer
National resource adequacy assessments.
Regional coordination centres shall perform week ahead to intraday regional adequacy assessments.
Short-term and seasonal adequacy assessments pursuant to Article 8 of Regulation(EU) 2019/941.
(c)coordinate, in cooperation with other involved authorities, the joint oversight of national,regional and European-wide adequacy assessments;
Preparation of seasonal adequacy assessments.
All short-term adequacy assessments shall be carried out according to the methodology developed pursuant to Article 8.
Each regional security coordinator shall perform regional adequacy assessments for at least the week-ahead time-frame.
National resource adequacy assessments shall contain the reference central scenarios as referred to in point(b) of Article 23(5).
Week-ahead to at least day-ahead regional system adequacy assessments and preparation of risk reducing actions.
National resource adequacy assessments may take into account additional sensitivities to those referred in point(b) of Article 23(5).
Participating in the establishment of the European and national resource adequacy assessments pursuant to Chapter IV of Regulation(EU) 2019/943;
The preparation of seasonal adequacy assessments shall be carried out on the basis of the methodology developed pursuant to Article 8 of Regulation(EU) 2019/941.
For the purpose of complementing the European resource adequacy assessment, Member States may also carry out national resource adequacy assessments pursuant to Article 24.
These are very short-term adequacy assessments(from weak-ahead to day-ahead) used in the context of system operation.
Where the national resource adequacy assessment identifies an adequacy concern with regard to a bidding zone that was not identified in the European resource adequacy assessment, the national resource adequacy assessment shall include the reasons for the divergence between the two resource adequacy assessments, including details of the sensitivities used and the underlying assumptions.
Those are very short-term adequacy assessments(from week-ahead to day-ahead) used in the context of system operation.
In addition, Regional Operational Centres also carry out regional adequacy assessments as defined in European legislation on electricity transmission system operation.
National resource adequacy assessments shall have a regional scope and shall be based on the methodology referred in Article 23(3) in particular in points(b) to(m) of Article 23(5).
Medium to long-term assessments are mainly used to identify adequacy concerns andto assess the need for capacity mechanisms whereas seasonal adequacy assessments are used to alert to short-term risks that might occur in the following six months that are likely to result in a significant deterioration of the electricity supply situation.
Regional coordination centres shall base the short-term regional adequacy assessments on the information provided by the transmission system operators of system operation region with the aim of detecting situations where a lack of adequacy is expected in any of the control areas or at regional level.
The option in which, based on regional or EU-wide generation adequacy assessments, entire regions or ultimately all EU Member States would be required to roll out capacity mechanisms on a mandatory basis was discarded as being disproportionate.
This assessment has a different purpose than the short-term adequacy assessments which are used to detect possible adequacy related problems in short time-frames,namely seasonal outlooks(six months ahead) and week-ahead to intraday adequacy assessments.
This assessment has a different purpose than the short-term adequacy assessments which are used to detect possible adequacy relatedproblems in short time-frames, namely seasonal outlooks(six months ahead) and week-ahead to intraday adequacy assessments.
The ENTSO for Electricity shall carry out the European resource adequacy assessment on an annual basis.
The European resource adequacy assessment shall be conducted by the ENTSO for Electricity.
The body that is responsible for the national resource adequacy assessment shall take due account of ACER's opinion, and where necessary shall amend its assessment. .
The ENTSO for Electricity should carry out a robust medium to long-term European resource adequacy assessment to provide an objective basis for the assessment of adequacy concerns.
The European resource adequacy assessment shall be based on a transparent methodology which shall ensure that the assessment: .
The European resource adequacy assessment shall cover each year within a period of 10 years from the date of that assessment. .
Use tools and consistent recent data that are complementary to those used by the ENTSO for Electricity for the European resource adequacy assessment.