Примери за използване на Cross-zonal на Английски и техните преводи на Български
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Computer
Capacity allocation' means the attribution of cross-zonal capacity;
In particular, cross-zonal capacity should not be reduced in order to resolve internal congestion.
Regional coordination centres shall carry out the coordinated calculation of cross-zonal capacities.
Cross-zonal capacity' means the capability of the interconnected system to accommodate energy transfer between bidding zones;
(d) be without prejudice to the Member States' right to establish national network codes which do not affect cross-zonal trade.
Maximise the opportunities for all market participants to participate in cross-zonal trade in as close as possible to real time across all bidding zones;
The following objectives shall have priority with the respect to the allocation of any revenues resulting from the allocation of cross-zonal capacity.
Regional operational centres shall take into account possible cross-zonal exchanges and operational security limits in all operational planning timeframes.
The extent of such derogations shall be strictly limited to what is necessary to maintain operational security andthey shall avoid discrimination between internal and cross-zonal exchanges.
Transmission system operators shall propose an appropriate structure for the allocation of cross-zonal capacity across timeframes, including day-ahead, intraday and balancing.
For borders using a flow-based approach,the minimum capacity shall be a margin set in the capacity cal- culation process as available for flows induced by cross-zonal exchange.
Transmission system operators shall recalculate available cross-zonal capacity at least after day-ahead gate closure times and after intraday cross-zonal gate closure times.
(b) for borders using a flow-based approach,the minimum capacity shall be a margin set in the capacity calculation process as available for flows induced by cross-zonal exchange.
The reservation of cross-zonal capacity for the exchange of balancing capacity shall be limited to 5% of the available capacity for the exchange of energy of the previous relevant calendar year between the respective bidding zones.
Member States shall be considered to be in compliance with Article 14 paragraph 7 if the capacity made available for cross-zonal trade is at least equal to the values of the linear trajectory.
Clear minimum levels of available capacity for cross-zonal trade need to be put in place in order to reduce the effects of loop flows and internal congestions on cross-zonal trade and to give a predictable capacity value for market participants.
Balancing markets shall ensure operational security whilst allowing for maximum use andefficient allocation of cross-zonal capacity across timeframes in accordance with Article 15.
Regional coordination centres shall calculate cross-zonal capacities respecting operational security limits using data from transmission system operators including data on the technical availability of remedial actions, not including load shedding.
Priority dispatch shall not endanger the secure operation of the electricity system,shall not be used as a justification for curtailment of cross-zonal capacities beyond what is provided for in Article 16 and shall be based on transparent and non-discriminatory criteria.
Without prejudice to the application of the derogations under paragraphs 3 and 9 of this Article and to the application of Article 15(2),this paragraph shall be considered to be complied with where the following minimum levels of available capacity for cross-zonal trade are reached.
The purpose of offering a minimum level of available capacity for cross-zonal trade is to reduce the effects of loop flows andinternal congestions on cross-zonal trade and to give a predictable cross-zonal capacity value for market participants.
Bidding zones shall not contain such structural congestions unless they have no impact on neighbouring bidding zones, or, as a temporary exemption, their impact on neighbouring bidding zones is mitigated through the use of remedial actions andthose structural congestions do not lead to reductions of cross-zonal trading capacity in accordance with the requirements of Article 16.
When cross-zonal capacity is available after the intraday cross-zonal gate closure time, transmission system operators shall use the cross-zonal capacity for the exchange of balancing energy or for operating the imbalance netting process.
When performing capacity calculation, regional coordination centres should calculate cross-zonal capacities using data from transmission system operators which respects the operational security limits of the transmission system operators' respective control areas.
Where cross-zonal capacity is allocated for the exchange of balancing capacity or sharing of reserves pursuant to Article 6(8) of this Regulation, transmission system operators shall use the methodologies developed in the guideline on electricity balancing adopted on the basis of Article 6(11) of Regulation(EC) No 714/2009.
Member States shall ensure that, during the implementation of their action plans the capacity made available for cross-zonal trade to be compliant with Article 16(8) is at least equal to the values of the linear trajectory, including by use of remedial actions in the capacity calculation region.
Once a methodology for the allocation process of cross-zonal capacity is approved by the relevant regulatory authorities, early application of the methodology by two or more TSOs could take place to gain experience and allow for a smooth application by more TSOs in the future.
Transmission system operators shall cooperate at Union level through the ENTSO for Electricity, in order topromote the completion and functioning of the internal market for electricity and cross-zonal trade and to ensure the optimal management, coordinated operation and sound technical evolution of the European electricity transmission network.
Transmission system operators shall allocate the available cross-zonal capacity plus any remaining cross-zonal capacity not previously allocated and any cross-zonal capacity released by physical transmission right holders from previous allocations in the next cross- zonal capacity allocation process.
Without prejudice to the forth subparagraph of Article 13(5),this paragraph shall be considered to be complied with if the following minimum levels of available capacity for cross-zonal trade, which is calculated pursuant to the capacity allocation and congestion management guideline adopted on the basis of Article 18 of Regulation(EU) 714/2009 taking account of contingencies, are reached.