The Department of Civil Protection.
TABLE 1 EARTHQUAKE DAMAGE TO BUILDINGS Source: Department of Civil Protection.
Department of Civil Protection.
According to the final implementation report, the Department of Civil Protection built 3 313 MAP houses and 33 temporary schools.
FIGURE 2 TRADITIONAL AND CASE STRATEGIES Traditional strategy CASE strategy Source: Department of Civil Protection.
Therefore, the cost declared by the Department of Civil Protection is not comparable with the cost reported in the manual.
Although Italy is at high seismic risk(see Annex III),it was the first time that the Department of Civil Protection adopted such a strategy.
After completing all CASE apartments, the Department of Civil Protection handed them over to L'Aquila municipality, which is currently managing them.
The experience gained in implementing this new strategy has already been mainstreamed by the Department of Civil Protection, as shown in footnote 26.
One month after the earthquake, the Department of Civil Protection considered that its estimate of the total number of unsafe buildings was reliable16.
BOX 3 AWARD CRITERIA AND WEIGHTING FOR THE PROCUREMENT OF BUILDINGS For the construction of the CASE buildings, the Department of Civil Protection followed an open tender.
The Department of Civil Protection based its calculation on a surface of 2 333 square metres, which differs from the method used by the reference manual.
If the conditions set out in Article 31(1)(c) of Directive 2004/18/EC are met,the contracting authority(i.e. the Department of Civil Protection) is entitled to reduce the time available for submission of bids.
Therefore, the Department of Civil Protection invited a relatively low number of companies to take part in negotiated procedures and received a low number of bids.
The experience gained in implementing this new strategy has already been mainstreamed by the Department of Civil Protection, by drafting technical specifications for different solutions to be procured via framework contracts.
Department of Civil Protection: The Italian Civil Protection is an integrated system that allows the coordinated use of all available state and private resources.
TABLE 4 PROGRESSION IN THE DELIVERY OF CASE APARTMENTS 20 Recently, the Department of Civil Protection drafted technical specifications for different solutions to be procured via framework contracts.
The Department of Civil Protection, assisted by international experts, including an EU civil protection team of Member States' experts, assessed the damage to buildings rapidly after the event.
However, given the initial delay in launching the procurement procedures, the Department of Civil Protection considerably reduced the time available for the submission of bids for all procedures(see Table 7).
On the day of the earthquake, the Italian Government declareda state of emergency, which conferred the powers of‘delegated commissioner for the emergency in Abruzzi' upon the Head of the Department of Civil Protection.
According to the Department of Civil Protection there were only a few companies capable of delivering the desired quantities and quality in a short time(details in Table 8).
On 28 April 2009 the Italian Government issued Decree Law No 39, known as the Decreto Abruzzo,which required the Department of Civil Protection to ensure the construction of CASE housing that could be used in a durable manner.
For the CASE project, the Department of Civil Protection signed contracts for a total amount of 710 million euro(excluding VAT)21, including civil works, green areas, furniture and other costs.
The cost calculated by the Court differs from the cost declared by the Italian Department of Civil Protection(1 314 euro/square metre) mainly because of a different calculation of the square metres of surface area.
As reported in the Department of Civil Protection, three people were killed under the ruins of industrial buildings in the town of San Felice sul Panaro, two- in Mirandola, one- at Concordia and Finale Emilia.
Norme Tecniche per le Costruzioni 2008',a document signed by the Italian Department of Civil Protection, refers to a maximum duration of 10 years for provisional works, but a minimum of 50 years for permanent works.
Following the earthquake, the Department of Civil Protection provided first emergency relief operations and assistance to around 67 000 people, who were, at the end of April 2009, accommodated in hotels and private houses(almost 32 000) and in tented camps(more than 35 000).
Implementation agreement: Agreement No C(2009)9138 signed between the Commission and the Department of Civil Protection on 11 November 2009, laying down the amount of the grant and the interventions financed by the EUSF following the Abruzzi earthquake.
Despite the possibilities offered by the Decreto Abruzzo, the Department of Civil Protection adopted more transparent open tendering procedures for the construction of buildings and supply of furniture, which accounted for more than 70% of the total expenditure on the CASE project. Negotiated procedures were used for only 30% of the expenditure, i.e. for the supply of pillars, concrete and seismic isolators.
The documentary analyses were complemented by interviews with and observations at the Department of Civil Protection, project sites and relevant stakeholders in the earthquake zone. Special Report No 24/2012- The European Union Solidarity Fund's response to the 2009 Abruzzi earthquake: the relevance and cost of operations.