Примери за използване на Offshore pipeline на Английски и техните преводи на Български
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Computer
The South Stream Offshore Pipeline.
Offshore pipeline installation took 15 months and was finished in November 2018 ahead of schedule.
The South Stream Offshore Pipeline.
This feedback will also be considered in the ongoing design and implementation of the South Stream Offshore Pipeline.
(m)"Offshore pipeline" means any pipeline which has been placed in the maritime area for the.
South Stream Transport has ordered over 75,000 pipes for second line of the South Stream Offshore Pipeline.
The South Stream Offshore Pipeline will consist of four parallel pipelines through the Black Sea, each with a length of 931 kilometers.
The Bulgarian Ministry of Environment and Water published the approval of the investment proposal for the South Stream Offshore Pipeline.
The South Stream Offshore Pipeline will consist of four parallel pipelines of 931 kilometres across the Black Sea.
This brings additional business to Bulgaria andat the same time ensures timely implementation of the South Stream Offshore Pipeline.”.
The South Stream Offshore Pipeline will consist of four parallel pipelines through the Black Sea, each with a length of 931 kilometres.
The Supervisory Board of South Stream Transport B.V. today approved the signing of a construction contract for the South Stream Offshore Pipeline.
The South Stream Offshore Pipeline will consist of four parallel pipelines through the Black Sea, each with a length of 931 kilometers.
The State Expert Review Commission reached a positive conclusion regarding the Design Documentation for the Russian Sector of the South Stream Offshore Pipeline.
The South Stream Offshore Pipeline will consist of four parallel gas pipelines each 931 kilometres long across the Black Sea, from Russia to Bulgaria.
As Head of International Projects, Mr. Karayannakos is involved in the Poseidon project, the new offshore pipeline that will connect the Greek and Italian natural gas transportation systems.
The South Stream Offshore Pipeline will be composed of 4 parallel underwater pipelines each made up of approximately 75,000 pipes with a diameter of 32 inch(813 mm).
Having DNV GL involved at both the design and implementation stages of the project ensures that the South Stream Offshore Pipeline is built in accordance with the approved design and specifications, thereby validating its integrity and safety.
The offshore pipeline will use pipes with a diameter of 32 inches(810 mm), designed for 27.73 megapascals(4,022 psi) of working pressure and having the pipe wall thickness of 39 millimetres(1.5 in).
We have worked over 2 years on the design andconstruction plans of the offshore pipeline to ensure that the pipeline will be safe and not a burden for the environment or the people in the vicinity.”.
The EIA Report contains the findings of the environmental, cultural heritage and socio-economic studies for the construction andoperation of the Bulgarian Sector of the South Stream Offshore Pipeline, conducted by a team of Bulgarian and international experts.
The Danish Energy Agency finds that the offshore pipeline project can be constructed and operated without unacceptable impact on the environment and safety.
The substance of Germany andFrance's proposal is that a country in whose territory the gas delivery point from the offshore pipeline is located, will also be entitled to choose the formula for applying EU Gas Directive rules to this project and possible exceptions.
The Danish Energy Agency finds that the offshore pipeline project can be constructed and operated without unacceptable impact on the environment and safety,” the group behind the….
The substance of Germany and France's proposal is that a country in whose territory the gas delivery point from the offshore pipeline is located, will also be entitled to choose the formula for applying EU Gas Directive rules to this project and possible exceptions.
No placement of a disused offshore installation or a disused offshore pipeline in the maritime area for a purpose other than that for which it was originally designed or constructed shall take place without authorisation or regulation by the competent authority of the relevant Contracting Party.
The substance of Germany andFrance's proposal is that a country in whose territory the gas delivery point from the offshore pipeline is located, will also be entitled to choose the formula for applying EU Gas Directive rules to this project and possible exceptions.
No such permit shall be issued if the disused offshore installation or disused offshore pipeline contains substances which result or are likely to result in hazards to human health, harm to living resources and marine ecosystems, damage to amenities or interference with other legitimate uses of the sea.
The essence of the proposal of Germany and France is that the country with the point of gas intake from the offshore pipeline in its territory will acquire the right to select the formula for application of EU Gas Directive provisions and possible exceptions from it.
The essence of the proposal of Germany andFrance is that the country with the point of gas intake from the offshore pipeline in its territory will acquire the right to select the formula for application of EU Gas Directive provisions and possible exceptions from it.