Примери за използване на Permit conditions на Английски и техните преводи на Български
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Computer
The installation complies with those permit conditions.
The reconsideration permit conditions shall be undertaken in any event where reconsidered and, where necessary, updated at least in the following cases.
Construction activities will be undertaken in accordance with permit conditions.
Best available techniques(BAT)conclusions are the reference for setting permit conditions for installations covered by Chapter II of Directive 2010/75/EU.
Operators should submit permit applications containing the information necessary for the competent authority to set permit conditions.
It also means that regulators must set permit conditions so as to achieve a high level of protection for the environment as a whole.
Member States must take the necessary measures to ensure that the permit conditions are complied with.
Permit conditions should therefore include the monitoring of soil and groundwater and the operator should remediate the site upon definitive cessation of activities.
The BAT conclusions provide national authorities with the technical basis for setting permit conditions for installations.
Article 14(4) allows the competent authority to set stricter permit conditions than those achievable by the use of the best available techniques as described in the BAT conclusions.
(1) that the operator provides the competent authority with a report on compliance with the permit conditions at least every twelve months;
The proposal requires that BAT reference documents are the reference for setting permit conditions and that emission limit values do not exceed the emission levels associated with the best available techniques as described in those BAT reference documents.
The BAT conclusions provide national authorities with the technical basis for setting permit conditions for installations.
Where an installation is not covered by any of the BAT conclusions, Article 21(4) requires that the permit conditions shall be reconsidered and, if necessary, updated where developments in the best available techniques allow for the significant reduction of emissions.
On request of the competent authority the operator shall submit all the information necessary for the purpose of reconsidering the permit conditions.
Instead the amount is fixed depending on the seriousness of the non-compliance with the permit conditions as assessed by the public inspection body(with a maximum amount48 set by the national legal provisions).
Member States shall take the necessary measures to ensure that competent authorities periodically reconsider and, where necessary,update permit conditions.
Articles 13 to 16 of the IED require that BAT reference documents are the reference for setting permit conditions and that emission limit values do not exceed the emission levels associated with the best available techniques as described in those BAT reference documents.
(8) Operators should submit an application for a permit to the competent authority which contains the information that is necessary for setting the permit conditions.
Any other information the competent authority considers relevant for the purposes of assessing compliance with storage permit conditions and increasing the knowledge of CO2 behaviour in the storage site.
By‘general binding rules' is meant emission limit values or other conditions, at least at sectorlevel,that are adopted with the intention of being used directly to set permit conditions.
It is clearly stipulated that permit conditions should include appropriate measures to prevent emissions to soil and regular surveillance of those measures to avoid leaks, spills, incidents or accidents occurring during the use of equipment and during storage.
Member States shall ensure the monitoring ofemissions into air in order to enable the competent authority to verify compliance with the permit conditions and Article 64.
In order to take account of developments in best available techniques orother changes to an installation, permit conditions should be reconsidered regularly and, where necessary, updated, in particular where new or updated BAT conclusions are adopted.
Where the Commission adopts a new or updated BAT reference document, Member States shall,within four years of publication, ensure that the competent authority, where necessary, reconsiders and updates the permit conditions for the installations concerned.
At the request of the competent authority, Article 21(2)requires the operator to submit all the information necessary for the purpose of reconsidering the permit conditions, including, in particular, results of emission monitoring and other data, that enables a comparison of the operation of the installation with the best available techniques described in the applicable BAT conclusions and with the emission levels associated with the best available techniques.
Following each site visit, the competent authority prepares a report describing the relevant findings regarding compliance of the installation with the permit conditions and conclusions on whether any further action is necessary.
Member States shall take the necessary measures to ensure that the competent authority authorities periodically reconsiders all reconsider permit conditions and, where necessary to ensure compliance with this Directive, updates those, update permit conditions.
In cases and at a frequency to be determined by the competent authority, the operator shall report, on the basis of aggregated data,all monitoring results to the competent authorities for the purposes of demonstrating compliance with permit conditions and increasing knowledge of waste and waste facility behaviour.
When adopting Without prejudice to the obligation to implement a permit procedure pursuant to this Directive, Member States may prescribe certain requirements for certain categories of installations in general binding rules,instead of including them in individual permit conditions, provided that Member States shall ensure an integrated approach and an equivalent high level of environmental protection as a whole are ensured equivalent to that achievable with individual permit conditions. .