K- The thickness of the sand cushion.
The layer of sand cushion can reach 10 cm.
Excavation work on the foundation and installation of a sand cushion.
Sealing of the sand cushion and filling the foundation plate.
Dig a small depression on the entire surface of the pad to form a sand cushion.
Create a sand cushion with a thickness of at least 20 cm;
Then the ground is deepened to a height of 40 mm,making room for the sand cushion and slabs.
Put the slabs on a sand cushion, keeping the seams as far as possible.
Previously, installation of wooden window frames was carried out with pre-laying sand cushions.
At the bottom of each hole is a sand cushion, on which the angled support is installed.
Since the grillage will be in the freezing zone,it must be insulated and equipped with a sand cushion of coarse-grained sand. .
Now there is no need to create a powerful sand cushion for the convenience of warming the foundation of the house.
After leveling the bottom of the pool, tamp it andmake sand pouring to form a sand cushion- again pound the sand. .
It is recommended to flatten the surface of the sand cushion by the rule in the direction of movement from the center to the edges of the site.
Note that when the underground passage of the pipes necessary depth of emplacement is 1 m(20 cm will be spent on the gravel and sand cushion).
Horizontal insulation is based on the filling of a sand cushion, followed by pouring a small layer of concrete and installing a plate warmer.
A significant drawback with the installation of the slab is its solid cost of concrete pouring andthe laboriousness of the foundation preparation device and sand cushion.
If there is no need to strengthen the bottom, then all the same it is necessary to lay a sand cushion 15 cm thick(meaning the thickness of the rammed sand). .
When used in subgrade pavement, excavation bed,set up the sand cushion(elevation difference is not more than 10 cm), rolling into a platform, laid grille, longitudinal axial should be consistent with the main stress direction and longitudinal lap 15- 20 cm, lateral 10 cm, build it with plastic belt binding, and on the laying of the grille, 1.5 2 m with U every nail fixed on the ground, laying geogrid should timely backfill material, laying of geogrid layers depending on the technical requirements.
If there is no need to strengthen the bottom,then all the same it is necessary to lay a sand cushion 15 cm thick(meaning the thickness of the rammed sand). .
At the bottom of the excavated trench laid gravel or sand"cushion" in the thick of 20-30 cm, which will act in the operation as drainage.
Before starting the concrete work, you should drain the part of the bottom of the pit to install the settling tanks,laying a sand cushion on it in a layer of 30-50 cm.
Avoid these hassles can be partially,if you set the foundation about 10 cm thick sand cushion and used to reverse nepuchinisty dusting the ground, for example, the same sand. .
The bottom of the pit littered"cushion" of sand 4-6 cm thick, which harbor agrovoloknom.
Construction on the bottom sand and gravel"cushion" layer of 10- 15 cm, followed by pouring water and tamping.
Concrete is recommended to use a low grade, so that the cushion of sand does not crack, it must be poured in water and held for 2-3 weeks.
If possible, make a cushion of cushion of large sand, 10 cm high and plus 10 cm of gravel.
Then, the bottom of the dug trenches is cleaned by hand and laid down with a sand and gravel cushion, followed by watering and tamping the bottom.
At the base of the concrete foundation, a cushion of gravel or sand should be poured, at least 10 centimeters thick.
To do this in the calculation of the foundation are making use of gravel or sand, which will serve as a cushion for concrete.