Примери за използване на Screeds на Английски и техните преводи на Български
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Computer
Insulation floor screeds.
Screeds and specific floor coverings.
Laser Guided Screeds.
Synthetic resin screeds and plaster screeds" harden".
Self levelling floor screeds.
Special screeds also help the foot to stay healthy.
Insulation roof screeds.
For flow screeds, the drying time is in square with the layer thickness.
The principle of operation is simple screeds.
Lighthouses for floor screeds based on screws.
As a basis for the parquet,using a cement or gypsum screeds.
The dominant purpose of floor screeds-leveling the surface.
Cement screeds are quite robust and undemanding in their drying behavior.
Only cement andcalcium sulphate screeds need to be dried.
The screeds and legs of a given length are cut with an allowance of 25 mm in width.
This can be done using nylon screeds, plasticine, etc.
The likelihood of anti-diffusion layer damage during installation andpouring concrete screeds.
You can also distinguish between screeds and theirconfiguration.
Now, with the development andimprovement of construction equipment to the fore this kind of tool as screeds.
The only disadvantage of dry screeds is the fact that they are not used with all heating systems.
This tool is used during installation orself-leveling floor screeds in the final stage.
Overall, the drying time of flowing screeds can be reduced by 30-50% with the help of these measures.
As a basis for laying a tileIt can be a concrete, reinforced concrete, brick walls,cement screeds, metal, old surface.
Cement screeds can be heated at the earliest after 21 days, calcium sulfate screeds at the earliest after 7 days.
Within 2-3 days after application is necessary to wet the surface of screeds with water to prevent it cracking.
For screeds, you can buy ready-made dry mixes or make a solution yourself(cement grade 500, sand, water, liquid glass).
Such a concrete mixer, made according to the drawings below,will greatly facilitate the work on pouring screeds and similar structures.
When the sawing process is carried out, the machine disk is tilted at an angle of 12°,removing the bevels along the edges of the legs and the edges of the screeds.
This method is the most simple and economical,since it excludes the time costs for creating and drying screeds and installing lags.
For semi-dry floor screed with addition of fiberglass will need these materials.