Примери за използване на Soil freezing на Английски и техните преводи на Български
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Computer
The depth of soil freezing.
This value can be changed for the regions with a high index of soil freezing.
Depth of soil freezing.
Another sign of unsuitable places is the degree of soil freezing.
Depth of soil freezing in the area.
Хората също превеждат
Identify the extent of soil freezing;
The depth of soil freezing during the cold season;
The estimated depth of soil freezing.
The depth of soil freezing in each region has its own value.
Depth of laying pipes in trenches should be below the level of soil freezing.
They are the result of soil freezing and poor ventilation of the greenhouse.
You need to take into account the depth of soil freezing.
The depth of soil freezing- how to find out the depth of freezing. .
When laying the foundation do not forget the depth of soil freezing in your area.
If the depth of soil freezing is more than a meter, it needs to be made deeper.
But the depth can vary because it depends on the level of soil freezing in your region.
If the level of soil freezing in your area is large enough, then warm septic tank Insulation can be any insulating material that can be used for laying in the ground.
It is necessary to know that a pile should be submerged to the depth of soil freezing that is about one and a half meters.
Features of our region's climate forced the owners of private households to think about the placement of all water-lifting equipment below the level of soil freezing.
The main thing is not to hurry,wait until the soil freezing, and only then securely close the ends of the structure.
Analyze the terrain, determine the type of soil, groundwater level and soil freezing;
Depending on the climate and the depth of soil freezing, the depth of the excavation is calculated, for the regions of the middle belt there will be sufficient depth of 3 to 3.5 m.
The size of the bayonet, on which it will enter the ground,depends on the depth of soil freezing.
The pit for the septic tank must be deep and1.5 mnecessarily deeper level of soil freezing, but without reaching the upper water intake level.
The depth of the septic tank andsewer pipes is directly dependent on the level of soil freezing.
During the last two decades soil freezing with liquid nitrogen(LIN) has developed from an exotic gas application with lots of uncertainties into a standard procedure for treating unstable soil and leakages.
The width of these holes should be at least 0.4 m anda depth below the level of soil freezing, approximately 1.5 m.
At a distance of 5-10 m from the house, close to the entranceswitchboard should dig a trench, about a half-meter depth(the depth of the trench can be longer,depending on the performance of soil freezing), repeating the form of an equilateral triangle at each vertex of which are driven ground electrodes 1.5-3 m(the length of the electrodes depends on the ground resistance), and the electrodes can be placed linearly, but in any case the distance between them should not be smaller than their length.
The most simple and effective way is the laying of a pipeline depth,which is much below the level of soil freezing.
The main feature of this adapter is that it can be used to withdraw pipe is much below the level of soil freezing, and the connection will remain absolutely airtight.