Примери за използване на The joists на Английски и техните преводи на Български
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Computer
I'm gonna work on the joists.
The joists are made grooves for the installation of intermediate beams.
Sheets DSP orOSB fastened to the joists.
But Kirk says that the joists were totally gone.
One of them is to fill all the voids between the joists.
Using screws attach the joists to the stakes.
Shtaketiny fastened to the joists with screws, gap- 2-4 cm.
Focuses on the joints of panels andattachment points to the joists.
It can be a design on the joists, floor height adjustment, dry concrete or screed.
Installing insulation. He fits into the space that sits between the joists.
On board is placed between the joists insulation.
At the same floor level becomes higher due to a heater,placed between the joists.
Then lay the board on the joists 250h25 mm in diameter at right frail to lag.
This system is very easy to assemble andcaninstalled directly on the joists and subfloor.
Boards to the joists must be fixed, leaving betweenthem a small gap- about 1-2 centimeters.
Plywood sheets are stacked on the joists up to 50 mm.
And as such distances 19-1= 18,we obtain the exact value of the width between the joists.
Just slide two support beams under the joists, jack it up, lower it onto a flatbed… and off you go.
If necessary, the boards are cut so thatjoints located directly on the joists.
They can be suspended from the joists and window openings- it is a matter of taste owners themselves.
Therefore desirable to arrange wooden floor directly on the joists, using them as logs.
In the special holes in the joists are screwed bolts For every two meters beam must be at least five holes.
Most often, the wooden floors in the bath are made ofboards,which are placed on the joists.
You can simply fix the subfloor to the joists with screws, but in this case the risk to get a little skewed.
Some of the roof is collected separately, andthen the finished design is attached to the joists.
In the space between the joists are laid layers of insulation, usually mineral wool, at least- of the foam.
Then, on top of the insulation is laid paroizolyator,which is attached to the joists using the bar(20x30 or 30x30).
Bruce on the joists and backing for them to raise the level of the floor surface(chamber drying 45x60 or 50x70 antiseptic).
If the floorboards creak or a little loose,they can be attached to the joists with screws, and the surface potsiklevat and putty.