How to use theodolite.
Theodolite appeared in the 17th century.
The device of a modern theodolite.
Theodolite moves in the following ways.
The principle of measurement by theodolite.
He used a theodolite from 150 miles away.
Friedrich, bring me the theodolite, please.
Why is a theodolite used in construction?
Lifting screws andlevels allow further installation of the level or theodolite.
Differences in theodolite and level devices.
Theodolite device has its own classification by accuracy.
The main difference of a theodolite from a level.
Electronic theodolite makes measurements automatically.
The main difference between the level and theodolite in their practical application.
Install a theodolite on the job site and level it.
Check the verticality of high mast lighting facilities(must be carried out regularly as required as required using the theodolite measurement and testing), permissible error should be less than the height of the rod slightly 3.
Further, the theodolite is used by the following floors.
The disadvantage is that the theodolite is much more expensive.
A theodolite is a U-shaped device, equipped with a stand and telescope.
It is possible to install a theodolite on the ground by using props.
Theodolite is fixed on a tripod, in some cases calibration is performed.
Measurement of vertical angles by a theodolite is a very popular function.
Optical theodolite differs only in that it requires preparation for work.
If you want to install a theodolite, the tripod for it must be centered.
Theodolite measurements can be carried out in horizontal and vertical angles.
Electronic theodolite has a measuring laser.
Theodolite has, in turn, horizontal and vertical threads arranged in diameters.
Technical device theodolite 4т30п and the principle of its.
Theodolite is a device designed for geodetic, design and construction work.
During construction theodolite is used to control the level of the building.