Примери за използване на To installations на Английски и техните преводи на Български
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Computer
This Chapter applies to installations producing titanium dioxide.
Tier thresholds for calculation-based methodologies related to installations(Article 12(1)).
The allowances are distributed to installations, and can be freely traded on the market25.
Projects range from theater to dance,multi-media performances to installations.
This article applies only to installations with fuel capacity> 20MW.
Ammunition would be blown up, fires started, aircraft sabotaged,mortars fired at the base with damage to installations”.
Member States may apply the criteria to installations with a lower fuel capacity.
These ambitions were supported by leading Native American casinos that showed serious interest in the products presented at G2E and committed to installations.
Free allocations shall only be given to installations where such information is provided.'.
They requested the competent French authorities to repeal Article 1 of Decree No 2004‑832 in so far as it made the decree applicable to installations in the steel sector.
(19) The BAT-AELs for TN and Ninorg do not apply to installations without biological waste water treatment.
(a) By derogation from point(a) of paragraph 1,where the operator For fugitive emissions, Member States shall apply fugitive emission values to installations as an emission limit value.
The general binding rules applicable to installations and the list of registered and authorised activities.
The provisions in this Directive concerning smart metering systems shall apply to future installations and to installations that replace older smart meters.
From photography and music video to installations and sound, his approach invites a walk-through symbolic and contemplative staging's.
Projects range from theater to dance, multi-media performances to installations. Reoccurring themes are identity.
With regard to installations, such disclosure shall include relevant information to the capacity and utilisation of installations, including planned or unplanned unavailability of such installations. .
Paragraphs 1 to 3 shall not apply to installations which are temporarily excluded from the scheme for greenhouse gas emission allowance trading within the Union in accordance with Article 27 of Directive 2003/87/EC.
(a) For fugitive emissions, Member States shall apply fugitive emission values to installations as an emission limit value.
Member States should also award support to installations using tenders, which may be either technology specific or neutral.
(Environment- Directive 2003/87/EC- Scheme for greenhouse gas emission allowance trading- German national allocation plan for emission allowances- Measures for the expost adjustment of the amount of allowances allocated to installations- Commission rejection decision- Equal treatment- Duty to state reasons).
Member States may limit their support to installations in Member States to which there is a direct connection via interconnectors.
(tt)'opened certificate scheme' means a certificate scheme implemented by a Member State,that is open to installations located in one or several other Member States;
The aforementioned paragraph 1(e) of the said Article does not apply to installations that are kept in reserve or standby and installations that are operated on a seasonal schedule, where all of the following conditions are fulfilled.
Aid shall only be granted to installations with an installed capacity of less than 500 kW for the production of energy from all renewable sources except for wind energy, for which aid shall be granted to installations with an installed capacity of less than 3 MW or with less than 3 generation units and for biofuels, for which aid shall be granted to installations with an installed capacity of less than 50 000 tonnes/year.
(4) The provisions of subsections(1)-(3) of this section do not apply to installations which are temporarily excluded from the scheme for greenhouse gas emission allowance trading.
The three preceding subparagraphs Paragraphs 1 to 3 shall not apply to installations which are temporarily excluded from the scheme for greenhouse gas emission allowance trading within the Community in accordance with Article 27 of Directive 2003/87/EC.
For the purposes of points(a) and(b),this provision shall only apply to installations starting operation after[3 years from date of adoption of this Directive].
(125) The conditions established in paragraph(124) do not apply to installations with an installed electricity capacity of less than 500 kW or demonstration projects, except for electricity from wind energy where an installed electricity capacity of 3 MW or 3 generation units applies.