Примери за използване на Vidin-calafat на Английски и техните преводи на Български
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Computer
CEO of"Danube Bridge Vidin-Calafat".
The Danube Bridge Vidin-Calafat was opened on 14 June 2013.
After examining the construction of the Bridge Vidin-Calafat, eng.
The Project“Danube Bridge Vidin-Calafat” is included in the Danube Strategy, so important for Bulgaria.
The Deputy Manager of the project“Danube Bridge Vidin-Calafat”- eng.
Danube Bridge 2(Vidin-Calafat) is now operational and attracts higher traffic volumes than expected.
Indeed, the opening of the bridge Vidin-Calafat was an important moment.
Mr. Radu Berceanu was met by the Manager of the Project“Danube bridge Vidin-Calafat”- eng.
After the signing of Act 16,Danube Bridge Vidin-Calafat will be handed over to the State.
The road junction,“trumpet interchange”, is constructed according to the project“Danube Bridge Vidin-Calafat”.
Km from the city is the Vidin-Calafat ferry that servicing the European transport corridor No. 4.
The Manager of Project“Danube bridge Vidin-Calafat”- eng.
The Project“Danube Bridge Vidin-Calafat” is the greatest Employer, compared to all the rest in the region.
Slavi Binev is the second MEP that visited the Danube Bridge Vidin-Calafat while it is being constructed.
The Open Door Day again gathered more than 60 people,willing to see the construction of Danube Bridge Vidin-Calafat.
The construction of pier РВ9 of Danube Bridge Vidin-Calafat in the navigable channel of the river was completed.
This is the second consecutive visit of the team of TV 7 to the site of the bridge at Vidin-Calafat.
Deputy Manager of the Project“Danube Bridge Vidin-Calafat” from the Spanish company- Contractor FCC Construccion.
For a third time the team of the German TV shot reportage for the construction of Danube Bridge Vidin-Calafat.
Alberto Vergara, Project Manager of“Danube Bridge Vidin-Calafat”, eng. Rafael Huerga, Deputy Project Manager, eng.
The assembly of the vessel impact protections has begun at the last pier of Danube Bridge Vidin-Calafat.
Are the bridges Rousse-Giurgevo and Vidin-Calafat enough for the intense transport traffic between the two countries?
Paul Tutsek andIldiko-Zsuzsa Hunyadi spoke with the Deputy Manager of the project“Danube bridge Vidin-Calafat” eng.
Every year the construction of Danube Bridge Vidin-Calafat is visited by students of various civil engineering specialties.
The total length of all the road junctions of the Adjoining Infrastructure to Danube Bridge Vidin-Calafat is 760, 89 m.
The Constructors of Danube Bridge Vidin-Calafat- Spanish, Portuguese, Czechs, Romanians, got acquainted with this ancient tradition.
This year's conference was attended by the author of the Danube Bridge Vidin-Calafat- Antonio Martinez Cutillas.
Engineers from“TransKapStroi” andthe“Designers Institute”- Moscow got acquainted with the construction of Danube Bridge Vidin-Calafat.
Of the construction works of the Infrastructure to Danube Bridge Vidin-Calafat, under the contract, have already been executed.
The official German delegation from Region Ortenau, The Federal Republic of Germany,visited Danube Bridge Vidin-Calafat.