Collection of Important Operational ParametersFor maximum transparency in the lighting system,L-DALI can record the operating hours of each lamp and also the energy consumption calculated.
By contrast, access to central bank accounts is allowed to only a limited number of entities,such as banks, and the operating hours of the central bank real-time gross settlement(RTGS) system are also limited.
Equip your operations with the right mix of industrial IoT, augmented reality,and analytics technology to ensure machine uptime and high-quality, high-volume throughput.
Collection of important Operational Parameters For maximum transparency in the lighting system,L-DALI can record the operating hours of each lamp and also the energy consumption calculated.
It records current work procedures, actual manual work times,machine running times, and numbers of each production in a certain time that are recorded with a stop watch.
In addition, 20% more extension of operation time can be realized by equipping it with the new type AC motor and a new type motor driver to have long time operation possible.
In terms of the time dimension, since February 2016, the Bank has extended the operating hours of the BOJ-NET until 9 o'clock in the evening,and will continue to consider appropriate operating hours through discussions with users.
English
中文
عربى
Български
বাংলা
Český
Dansk
Deutsch
Ελληνικά
Español
Suomi
Français
עִברִית
हिंदी
Hrvatski
Magyar
Bahasa indonesia
Italiano
Қазақ
한국어
മലയാളം
मराठी
Bahasa malay
Nederlands
Norsk
Polski
Português
Română
Русский
Slovenský
Slovenski
Српски
Svenska
தமிழ்
తెలుగు
ไทย
Tagalog
Turkce
Українська
اردو
Tiếng việt