英語 での Final assembly line の使用例とその 日本語 への翻訳
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
-
Programming
The A380 Final Assembly Line.
It will be the firstmajor section of the A350 XWB to enter the final assembly line.
The A350 XWB Final Assembly Line.
The final assembly line in China is a joint venture between Airbus(51 per cent) and the Chinese industry Consortium(49 per cent).
In July this year,Airbus has announced its decision to establish an A320 Family final assembly line in the United States.
An all new automated final assembly line for the H160 will also be inaugurated second half of this year.
He held various positions in theManufacturing before being in charge of the single-aisle aircraft final assembly lines from 1988 to 1992.
The pre-assembly& final assembly line is able to assemble many different kinds size of refrigerator.
For Model 3, we have completed production line layouts andwill soon begin installation of new welding and final assembly lines.
When all the parts have been prepared, they go through the final assembly line and carefully checked before packed and shipped all over the world.
The parties also concluded a memorandum of understanding(MOU)to validate the opportunity to set up a Q400 NextGen final assembly line in Russia.
The helicopter's final assembly line in Marignane is in the final stages of preparation and will be ready to start serial production shortly.
This phase will continue over the coming weeks, and once completed,the front fuselage will be transported to the A350 XWB Final Assembly Line in Toulouse.
Under the MOU, Bombardier andRostec will validate the opportunity to set up a Q400 NextGen final assembly line in Russia that would be managed by a joint venture between the two parties.
At BYD's manufacturing plant in the southern Chinese city of Shenzhen, 600 workers and a host of robots mount tires anddashboards into electric cars that roll off the final assembly line every 90 seconds.
Should definitive agreements be reached,a Q400 NextGen aircraft final assembly line in Russia would produce aircraft for Russian customers and would be incremental to Bombardier's current Q400 NextGen aircraft production operations in Toronto, Canada.
Two pilots and one loadmaster ship these aircraftparts from different production sites across Europe to the final assembly lines in France and Germany.
Aircraft parts are equipped with electrical andmechanical systems before eventually being delivered to the final assembly lines in France, Germany, China and the U. S.
Alenia Aermacchi is responsible for the production of the F-35 wing as a second production line in addition to Lockheed Martin,and has started production of components for the final assembly line of aircraft in the USA and in Italy.
Production line for final assembly of harness.