英語 での Pipings の使用例とその 日本語 への翻訳
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
-
Programming
Low pressure pipings: UPVC.
All pipings and fittings.
Port size ø1.8 andø2mm type is best suitable for the pipings of small actuator etc.
High pressure pipings and valves: stainless steel.
Connections from fluid powerplanning can be routed freely as pipings in the layout space.
Pipings can be arrenged by mounting piping port on head side.
Avoids interference with the pipings and tracks above the openings.
For pipings these are the symbol macros Pipe1. ems to Pipe5.
Its structure is designedfocusing on safety by removing high pressure pipings and placing the pressurizing cylinder on its upper part to lower the work height.
Mark one or more pipings for which manufacturing data are to be generated in the connections navigator or in the layout space.
Cause In the schematic or in the P&I diagram there are at least twoconnection designations on connections to which different potentials or pipings are assigned.
You can predefine pipings with specific properties in the pre-planning navigator.
Main Application: Aluminum anodes are suitable for the cathodic protection for such metal structures as ships, machinery, offshore engineering,harbor facilities, and pipings and cables in an ooze corrosion environment.
Tubes come in a variety of colors(5 colors) so that pipings can be identified by color or can be completed in the same colors as the devices.
All pipings, substances and pipe classes which are on a P&I diagram can be manually placed in certain report types as embedded reports in the respective P&I diagram.
Inserting piping definition points in the P&I diagram For the definition of pipings you can on the one hand use the piping planning objects from the pre-planning.
Pipings that were designed as multi-line connections between fluid power items or screw connections on a fluid power schematic page can be routed freely in the layout space.
This means that you do not have to enter the relevant data time and again, but can rather use these templates repeatedly when creating new segments in the pre-planning orwhen defining pipings in the P&I diagram.
Even if you define pipings in the P&I diagram without pre-planning, meaning without linked piping planning object, it may be necessary to transfer the modified piping data(for example a different pipe class) of the piping definition point to the associated connections and functions.
Marking and editing the piping route You can use the menu items Project data< Connections< Piping route to temporarily highlight the specified pipings in the P&I diagram and, if necessary, also edit the route of pipings.
When reporting pipings in the P&I diagram it is now possible that the following embedded reports relevant to the page are output: P&I diagram: Piping overview Preplanning: Pipe class overview Preplanning: Substance overview. So that only the data of the respective current page is considered at the manual placement on a P&I diagram page, you can now activate the Current page check box for these report types in the Select report dialog.