When is Construction Planned?
His 601 project has been built from plans.
At the end of 2015, China had plans to build 515GW of new coal capacity.
Plan Build Run.
International Training Workshop on Planning Construction Operation Management.Combinations with other parts of speech
In 2010, the construction planning of.
Find out about construction planning.广东省规划建设第三座核电站,即阳江核电站,安装6台100万千瓦核电机组。
Guangdong province plans to build third nuclear power plants, Yangjiang nuclear power plant, the installation of 6 sets of 1 million kilowatts of nuclear power unit.今年,全县规划建设扶贫车间427个,目前已开工建设411个、完工343个。
This year, the county plans to build a total of 427 poverty alleviation workshops, of which 411 have been started and 343 have been completed.公司规划建设一个国家级新能源车锂离子电池隔膜生产基地,一个国家级新能源车锂离子电池隔膜技术中心。
Our Company plans to build a national-level new energy vehicle lithium-ion battery separator production base, a national-level new energy vehicle lithium-ion battery separator technology center.据了解,吉华医院占地面积近6万平方米,规划建设床位3000张,初步建设投资491300.91万元。
It covers an area of nearly 60,000 square meters, plans to build 3,000 beds, and initially constructs an investment of 491.3091 million yuan.北京城垣的保护与拆除”,《北京规划建设》1999年第2期。
Beijing city wall protection and removal,""Beijing plans to build" 1999 2.当前,东莞正在规划建设中子科学城,面积45.7平方公里。
At present, Dongguan is planning to build a Neutron Science City with an area of 45.7 square kilometers.
In addition, the town is planning construction of four"new generation" light with the city.永久校区正在规划建设中的位于机场高地,锡卜,马斯喀特的土地在未来几年。
The permanent campus is being planned for construction in the coming years on land located in Airport Heights, Seeb, Muscat.
You will have the most important role- is planning the construction and implementation of it into practice.规划建设的质量将在审查过程中得到验证,从而保证您的房产质量。
The quality of the planned construction, verified during its review, will be guaranteed in your property.每个项目的每个阶段,从概念到规划建设,我们都会与客户进行密切的接触。
Every stage of each project, from concept to planning to construction, is carried out in close contact with the Client.拟规划建设TierIV(最高级别)、10万机柜规模的世界领先的国际数据中心.
It is planned to build Tier IV(the highest level) and a world-leading international data center with 100,000 cabinets.它的西侧是已经开工建设的响螺湾商务区,南侧是未来将要规划建设的生态居住区,东侧为形似鲸鱼的岛屿蓝鲸岛生态区。
It is already under construction on the west side of Xiangluowan business district,south of the future will be planning the construction of ecological residential area, east of the island shaped like a whale.
New District Management Committee Planning and Construction Bureau.
Construction management is ready.
All cities shall be built on the same plan;
Planning for two new hospitals.
Project planning and general contracting services.
Construction complete in two years.
(b) Construction of section.
Building connections with their environment.