Ví dụ về việc sử dụng Design bureau trong Tiếng anh và bản dịch của chúng sang Tiếng việt
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
This page is about the aircraft design bureau and manufacturer….
The Tu-204 is a narrow-body medium-haulpassenger aircraft created by the Tupolev experimental design bureau.
Status-6 was built by Rubin Design Bureau, the largest of Russia's three submarine manufacturers.
The 9M113 Konkurs was developed by the Tula Machinery Design Bureau(Tula KBP).
After graduation, he worked in his uncle's design bureau, at first as the chief engineer, but later was appointed deputy chief designer.
As for the Project 1135 ships,they are some of the very best our design bureau has ever delivered.
The Mikoyan and Gurevich Design Bureau, now known as the MiG Russian Aircraft Corporation, was founded on December 8, 1939.
The project is conducted by Malachite Design Bureau(St. Petersburg).
The use of a nuclear engine in spacecraft is being worked out by another enterprise in the rocket and space industry,the Arsenal Design Bureau.
Sarmat is being developed by the Makeyev Rocket Design Bureau in the city of Miass east of the Ural Mountains.
In 1956, Balashova accepted the Senior Architect position at OKB-1,the Soviet Union's Experimental Design Bureau.
The development of the project was entrusted to the team of the Kolomna Design Bureau of Civil Aviation under the direction of B. Shavyrina.
Антонова, formerly the Antonov Design Bureau, is a Ukraine-based(since 1952) aircraft manufacturing and services company with particular expertise in the field of very large aircraft construction.
It is a twin-engined turboprop transport aircraft,designed by the Antonov Design Bureau in Kiev, Ukraine.
Antonov Airlines, a subsidiary of the Antonov Aerospace Design Bureau is the one operator of the world's largest mounted wing plane, the An-225.
But experts noted striking similarities to the R-27Zyb or“ripple” manufactured by the Makeyev Rocket Design Bureau in Miass.
Other SUO-30PK subsystem is developed by Aviation Automation Design bureau at Kursk, and it can be used to control unguided air-to-ground weaponry.
Even before the flight tests of the bomber began, the first sketches of a jet passenger aircraft, which could be based on the Tu-16,were created at the Tupolev experimental design bureau.
Project 11711 developed by Nevskoe Design Bureau is an evolution of Project 1171, under which Yantar Shipyard built the 14-ship series in 1960-1970's.
The exercise equipment to the left was developed by a leading nuclear submarine designer,the Rubin Design Bureau, while the one on the right was donated by patron organizations.
While in confinement, he worked at NKVD's Central Design Bureau No. 29(ЦКБ-29 НКВД) in Moscow under the guidance of Vladimir Petlyakov, designing the Pe-2 bomber.
In October of this year,the media reported on another project of a promising high-speed helicopter of the Kamov Design Bureau, designed according to a coaxial scheme.
According to some reports, representatives of Ukraine's Luch design bureau participated in the Sino-Belarusian project on the Polonez MLRS, recently successfully tested by Minsk," Khramchikhin said.
The Tu-142M is a long-rangeanti-submarine/ reconnaissance aircraft designed by the Tupolev Design Bureau and manufactured by the Kuibyshev Aviation and Taganrog Machinery plants.
Among industrial companiesare world famous giants like the Morozov Design Bureau and the Malyshev Tank Factory, leaders in tank production since the 1930s; Hartron(aerospace and nuclear electronics) and the Turboatom turbines producer.
The Mil Mi-6(NATO reporting name"Hook")was a Soviet/Russian heavy transport helicopter designed by the Mil design bureau and built in large numbers for both military and civil roles.
On August 30, 1974,USSR secret decree№ 695-227 ordered Dnepropetrovsk's Yuzhnoe Design Bureau, an intercontinental ballistic missile manufacturer, to create this system.
However, according to the leaked paper,the weapons system could be developed by the Rubin design bureau for marine engineering, and may potentially be delivered using nuclear-powered“Project 09852” and“Project 09851” submarines.