Ví dụ về việc sử dụng Mrp trong Tiếng anh và bản dịch của chúng sang Tiếng việt
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
MRP group in SAP.
Have experience in MRP/ ERP.
MRP II systems can provide.
Working knowledge of MRP system.
Define an MRP controller in SAP.
Can anyone answer my question to MrP.
MRPII systems begin with MRP, material requirements planning.
You are now moving from MPS into MRP.
A meal-replacement product(MRP) does exactly what its name suggests.
While MRP allows for the coordination of raw materials purchasing, MRPII facilitates the development of a detailed production schedule that accounts for machine and labor capacity, scheduling the production runs according to the arrival of materials.
The overall ERP system needs tohave a system of coding parts such that the MRP will correctly calculate needs and tracking for both versions.
To avoid an"explosion" of data processing in MRP(number of BOMs required in input) planning bills(such as family bills or super bills) can be useful since they allow a rationalization of input data into common codes.
Nd Marine Reconnaissance point(Pacific Fleet) 388th Marine Reconnaissance point(Black Sea Fleet)-reorganized from the former 431st MRP 420th Marine Reconnaissance point(Northern Fleet) 561st Marine Reconnaissance point(Baltic Fleet).
MRP II also provided a compelling vision of how organizations could leverage software to share and integrate enterprise data and boost operational efficiency with better production planning, reduced inventory, and less waste(scrap).
For example,a'walk around' stock intake done just prior to the MRP calculations can be a practical solution for a small inventory(especially if it is an"open store").
The SAP MRP transactions will define for example which time is necessary to produce a chosen amount on time, and found out what could be missing, like some raw material stock, or other products based on their SAP material type and the production recipe.
As the demand-driven economy fuels the rising relevance of Industry 4.0,Monitor Systems is slated to support the shift from traditional MRP(material requirements planning) to DDMRP(demand-driven materials requirement planning).
Students will have an MRP committee to oversee and assist with their chosen project, made up of a faculty supervisor and one consulting committee member drawn from a government, community or private organization directly related to their MRP topic.
Orlicky wrote"Materials Requirement Planning" in 1975,[27] the first hard cover book on the subject.[26] MRP II was developed by Gene Thomas at IBM, and expanded the original MRP software to include additional production functions.
Both MRP and MRPII are still widely used, independently and as modules of more comprehensive ERP systems, but the original vision of integrated information systems as we know then today began with the development of MRP and MRPII in manufacturing.
Confirmation: Receipt of payment andapproval for go-ahead of lead-time components as each milestone is realized[4] MRP(material requirements planning): Planned orders for all required materials and elements are issued across the complete BOM.
As against the common practice of printing an MRP on the product and selling it in the market, auction is a practice of arousing curiosity among the people about a product and then allowing people to participate in an open auction where they place their bids to get hold of the product.
Queue theory is based on Markov chains and stochastic processes.[50] It also worth noticing that computations of safety stocks are usuallybased on modeling demand as a normal distribution and MRP and some inventory problems can be formulated using optimal control.[51].
Other businesses and The Gartner Group in the 1990s desired to use MRP systems to varying business types and, sought to expand processes and capabilities to other facets within a company, and this birthed the ERP as is known today.
MRP had some notorious problems such as infinite capacity and fixed lead times, which influenced successive modifications of the original software architecture in the form of MRP II, enterprise resource planning(ERP) and advanced planning and scheduling(APS).
In the 1990s,The Gartner Group and other businesses sought to apply MRP systems to other business types, and desired to expand capabilities and processes to other areas within an organization, and thus ERP as we know it today was born.
Students in the MRP option will complete a total of 18 credits, including required courses in Sociological Theory, Research Design, and either Quantitative Analysis or Qualitative Analysis, along with three additional elective courses which may include a practicum placement with a government, community or private agency.
While they acknowledge that the use of heuristics, like those prescribed by MRP and MRP II, were necessary in the past due to lack of computational power to solve complex optimization models, this is mitigated to some extent by recent improvements in computers.
Manufacturing Resource Planning or Management resource planning(or MRP2)- Around 1980, over-frequent changes in sales forecasts, entailing continual readjustments in production, as well as the unsuitability of the parameters fixed by the system,led MRP(Material Requirement Planning) to evolve into a new concept.