Ví dụ về việc sử dụng Second runway trong Tiếng anh và bản dịch của chúng sang Tiếng việt
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
There is space for a second runway.
In 1968 the second runway was completed.
Continue along, this is the second runway.
Anyway, when the second runway was opened, the first one would be closed and overhauled.
In 2006, the airport opened a second runway.
The reconstruction of the second runway is scheduled to begin in 2007.
Due to the lack of space,the airport could not build a second runway.
By 2026, the second runway will be built to allow the operation of the Airbus A380.
These words raised the question of why the second runway is still not over.
The second runway had a trial flight in October 2009 and is expected to be in use soon.
At Istanbul's three airports,experts assessed flight safety:“Sabiha Gökçen is the second runway.”.
The second runway 05/23 was built in 1976 and in 1999 the main runway was lengthened.
The airport itself is undergoing expansion, with a second runway to accommodate the thousands of tourists who arrive each day.
The second runway must be finished as soon as possible but it does not mean that it is unsafe to be taken care of.”.
Koltsovo Airport in Yekaterinburg was upgraded with radio-engineering tools for flight operation andreceived its second runway strip.
A second runway, possibly to be constructed in the next 15 years, would assist with growing passenger numbers to Hobart.
For the third phase after 2025,Vietjet would develop a second runway which is 3,250 meters long and 65 meters wide in the east of Chu Lai airport.
The second runway, which started to be built in Sabiha Gökçen Airport in 2015, is planned to be put into service by the end of 2020.
The plan shows an expansion of the airport to a maximum capacity of eight million passengers per annum,without the addition of a second runway, or significant expansion of the airport boundaries.
The next phase of development was the second runway, which was completed three months ahead of schedule and opened in April 1984.
The plan provides for a step-by-step expansion of the airport to a maximum capacity of8 million passengers a year without the construction of a second runway or the expansion of existing airport boundaries.
A second runway, 3,500 metres long, was built and completed by the United States in late 2006, at a cost of US$68 million.
In agreement with the Airports Commission's recommendation,the UK government offered their endorsement of the Heathrow expansion over adding a second runway to Gatwick Airport south of London.
Percent of the first stage of the second runway work of Sabiha Gokcen airport was completed and the second stage came to the level of 67 percent.
When Singapore wanted to expand its airport operations in the early 1970s,a British aviation consultant proposed building a second runway at the existing airport in Paya Lebar as that would entail the lowest land acquisition costs and the least resettlements.
There are plans to build a second runway when the annual traffic of the airport reaches 18 million passengers a year which is currently estimated to reach around 20132014.
Construction for the second phase would commence immediately after the completion of Phase 1 andinclude the second runway, 50 new aircraft parking bays in addition to the existing 70 bays, a second fire station and a third cargo agent building.[77].
In 2008 the proposal of a second runway at Stansted saw local house prices fall by -2.6% on average between the announcement and the withdrawal of that proposal in 2010.
The source toldInterfax that Russia will start repairing a second runway at Hmeimin air base near Latakia, while the Tartus naval base will be upgraded in order to handle bigger ships such as cruisers.