Eksempler på brug af Dig a trench på Engelsk og deres oversættelser til Dansk
{-}
-
Colloquial
-
Official
-
Medicine
-
Financial
-
Ecclesiastic
-
Official/political
-
Computer
And dig a trench for it.
Outline the circle boundaries, you dig a trench and install the casing.
Dig a trench to collect moisture.
It is with them it is necessary to start construction work- dig a trench, lay pipe, etc.
Dig a trench the size of the workpiece.
To this end, along the basement dig a trench width of 1 m, laid insulation boards and covered.
Dig a trench, the width and depth of which depends on the height and the wall material.
To strip foundation necessary dig a trench, pour into it a layer of sand of about 15-20 cm.
Dig a trench under the concrete foundation can be like using an excavator, or manually.
At one of these parts along the basement dig a trench width of 40-50 cm and a depth equal to the depth of the old foundation.
Dig a trench with a depth of two feet, and the width and length dimensions depend on the particular metal furnace;
If the foundation is indestructible around the perimeter due to load changes or high humidity, around the perimeter of the tape orcolumnar foundation piles must dig a trench.
To do this, dig a trench width of about 40 cm.
So dig a trench depth of 0.7 m to 1 m(below freezing soil), a width of 0.5.
Additionally, we dig a trench leading to the power cabinet.
If you dig a trench, three of the four sides are completely closed for leak even without a magnetic field.
First, dig a trench along the perimeter strips 600 mm deep structure.
You should first dig a trench depth of about 0.7 meters, the bottom of which should be located below the level of soil freezing.
To do this, dig a trench with a bias to either buy water drainage channels, which have provided the desired angle.
At a distance of 5-10 m from the house,close to the entranceswitchboard should dig a trench, about a half-meter depth(the depth of the trench can be longer, depending on the performance of soil freezing), repeating the form of an equilateral triangle at each vertex of which are driven ground electrodes 1.5-3 m(the length of the electrodes depends on the ground resistance), and the electrodes can be placed linearly, but in any case the distance between them should not be smaller than their length.
Around the perimeter of the basement digging a trench to a depth of 0.4 m.
Then create grooves for water drainage and digging a trench(30 cm) anchor.
Digs a trench in the form of an equilateral triangle.
This markup is the benchmark by which digs a trench depth required.
But the garage can be built directly on leveled ground without digging a trench.
The crew digs a trench to get to the frozen ground beneath big red.
Accordingly markup dug a trench width of 20-25 cm,a depth of 0.5 m.
Digs a trench for the previously executed layout.
In accordance with the selected configuration dug a trench depth of 0.8 meters.
Its essence is that digging a trench along the foundation at the site of 1-2 meters, the old foundation is completely removed, and poured new in its place.