Exemplos de uso de Contraaor em Inglês e suas traduções para o Português
{-}
-
Colloquial
-
Official
-
Medicine
-
Financial
-
Ecclesiastic
-
Ecclesiastic
-
Computer
-
Official/political
However, the contraaor shall be responsible for the proper construction.
Where, in the course of carrying out the works, the contraaor encounters bench-marks indicating the.
The contraaor shall himself superintend the works or shall appoint a representative to do so.
Any aa or omission of the contraaor during the maintenance period.
The contraaor shall not subcontract without the prior written authorization of the contracting authority.
Contraa, the supervisor shall not have authority to relieve the contraaor of any of his obligations under the contraaor. .
If the contraaor fails to remedy a defea or damage within the time limit stipulated in the notification, the contracting authority may.
An assignment shall be valid only if it is a written agreement by which the contraaor transfers his contraa or part thereof to a third party.
The contracting authority may, thereafter, complete the works himself orcondude any other contraa with a third party for the account of the contraaor.
Minimum economic and technical conditions required of the supplier, contraaor or provida to whom the contraa is awarded.
The repair of any damage caused to roads, tracks or bridges by the transpon of materials, plant orequipment shall be at the expense of the contraaor.
In the event of such termination,the contraaing authority shall pay the contraaor for any loss or damage the contractor may have suffered.
The contraaor shall take all essential steps, on his own responsibility and at his expense, to ensure that existing structures and installations are protected, preserved and maintained.
And demolition work carried out onland belonging to him, subject to compensating the contraaor for any spedal efforts.
Upon provisional acceptance of the works, the contraaor shall dismantle and remove temporary struaures as well as materials no longer required for use in connection with the performance of the contraa.
The approval of the drawings, documents, samples ormodels by the supervisor shall not relieve the contraaor from any of his obligations under the contraa.
The contraaor may examine the work register at any time and may, without removing the document, make or receive a copy of entries which he considers necessary for his own information.
As soon as is possible after termination, certify the value of the works andall sums due to the contraaor as at the date of termination.
The contracting authority and the contraaor shall make every effort to amicably settle disputes relating to the contraa which may arise between them, or between the supervisor and the contraaor.
In any case where the contraaing authority is entitled to damages,he may dedua such damages from any sums due to the contraaor or from the appropriate guarantee.
Rejeaed components and materials shall be removed by the contraaor from the site within a period which the supervisor shall specify,failing which they shall be removed by the supervisor as of right at the expense and risk of the contraaor.
Where the spedal conditions stipulate that the maintenance work,necessitated by normal wear and tear, shall be carried out by the contraaor, such work shall be paid for from a provisional sum.
The contraaor may apply, by notice to the supervisor, for a certificate of provisional acceptance not earlier than 15 days before the works, in the contraaor's opinion, are complete and ready for provisional acceptance.
If the contraaing authority terminates the contract,it shall be entitled to recover from the contraaor any loss it has suffered up to the maximum amount stated in the contraa.
In case of emergency, where the contraaor cannot be reached immediately or, having been reached, is unable to take the measures required, the contracting authority orthe supervisor may have the work carried out at the expense of the contraaor.
Where a variation is necessitated by default orbreach of contraa by the contraaor, any additional cost attributable to such variation shall be borne by the contraaor. .
Within 30 days of receipt of the said application for interim payment, it shall be approved or amended in such a manner that, in the supervisor's opinion,the application reflects the amount due to the contraaor in accordance with the contraa.
The contracting authority orits duly authorized representative and the contraaor shall sign the final statement of account as an acknowledgement of the full and final value of the work ρ erformed under the contraa and shall promptly submit a signed copy to the supervisor!
When components and materials have passed the tests referred to in Artide 41, the supervisor shall notify the contraaor or endorse the procedure's certificate to that effea.
Should the advance guarantee cease to be valid and the contraaor fail to re-validate it, cither a deduction equal to the amount of the advance may be made by the contraaing authority from future payments due to the contraaor under the contraa, or the contraaing authority may apply the provisions of Artide 15.6?