India has also repaired and upgraded over 100 MiG fighter aircraft of the Vietnam Air Force and supplied them with enhanced avionics and radar systems.
如果你像我一样,你可能会推迟安全修复并在你的电脑上添加新功能,即使它们已经准备好了。
If you're like me, you're probably delaying security fixes and the addition of new features on your PC, even though they're ready to go.
当肠道粘膜已修复并,毒素和坏细菌被消除后,肠漏综合征的状况将得到改善。
When the intestinal lining is repaired and the toxins and bad bacteria eliminated, the condition of leaky gut will be improved.
位于Billiter大街19-21号,建于1865年的二级保护建筑将被修复并整合到拟议的方案中。
A grade II listed building at 19-21 Billiter Street, which was built in 1865,will be restored and integrated into the development.
它有足够的智能来评估各种bug修复并向工程师提供建议。
It's intelligent enough to evaluate various bug fixes and provide a recommendation to the engineers.
在因机械故障而停摆了一个半小时后,D炮塔得到修复并再次准备好投入使用。
Over an hour and a half after having failed due to mechanical difficulties,D turret was repaired and again ready for action.
北部11个拘留设施于2009年1月份已经修复并移交给科特迪瓦当局。
Eleven detention facilities in the north were rehabilitated and handed over to Ivorian authorities in January 2009.
AngularJS1.6于2016年12月发布,之后的九次补丁发布进行了修复并做了一些小的改进。
AngularJS 1.6 was released in December 2016,followed by nine patch releases that brought fixes and small improvements.
又于2019年6月28日翻新、修复并开放,供应中餐。
It was renovated, restored and opened on June 28, 2019 serving Chinese food.
我们必须修复并取缔社会上每一个阶层都存在的看护工作中的系统性鸿沟。
We must repair and replace the systemic disparities that permeate care giving at every level of society.
在这个过程的下一步和最后一步,我们将做一些修复并观察结果。
Next and last in this process,what we're going to do is make some fixes and observe the results.
位于Billiter大街19-21号,建于1865年的二级保护建筑将被修复并整合到拟议的方案中。
A Grade II listed building at 19-21 Billiter Street, built in 1865,will also be restored and integrated in the proposed scheme.
在更多的洪水破坏之后,基本上就是这个结构被加强了,修复并形成你今天看到的。
After more flood damage it wasbasically this structure that was strengthened in 1357, repaired and formed into what you see today.
修复并维护现有9个跑道和565公里道路的运输基础设施,包括排洪系统和桥梁.
Repair and maintenance of the existing transportation infrastructure of 9 runwaysand 565 kilometres of roads, including storm water drainage and bridges.
中文
Bahasa indonesia
日本語
عربى
Български
বাংলা
Český
Dansk
Deutsch
Ελληνικά
Español
Suomi
Français
עִברִית
हिंदी
Hrvatski
Magyar
Italiano
Қазақ
한국어
മലയാളം
मराठी
Bahasa malay
Nederlands
Norsk
Polski
Português
Română
Русский
Slovenský
Slovenski
Српски
Svenska
தமிழ்
తెలుగు
ไทย
Tagalog
Turkce
Українська
اردو
Tiếng việt