Submarine Cable System Monitoring and Repair Practice Lecture.
年8月5日,第一份海缆电报横越大西洋。
August 1858: the first transatlantic telegraph cable is completed.
PEACE海缆系统启动巴基斯坦与吉布提登陆合作.
PEACE Cable initiating landing cooperation with Pakistan and Djibouti.
仅在2001年,八根新海缆就连接了北美和欧洲。
In 2001 alone, eight new cables connected North America and Europe.
海缆系统在这里设立了登陆站,连接至东方各国。
The cable systems having landing stations connecting to the eastern world.
年8月5日,第一份海缆电报横越大西洋。
On the 5th of August, 1858,the first Atlantic telegraph cable was laid.
因此,提高海缆和水下装备系统的品质迫在眉睫。
Therefore, it is imminent to improve the quality of submarine cable and underwater equipment systems.
仅在2001年,八根新海缆就连接了北美和欧洲。
Eight new cables were laid down in 2001 alone between Europe& North America.
Facebook和GlobeNet启动通往阿根廷的Malbec海缆建设.
Facebook andGlobeNet begin construction on new Brazil to Argentina subsea cable.
该海缆系统基于200G波分技术,将提供高达60T的设计容量。
The submarine cable system, based on 200G DWDM technology, will boast up to 60Tbps of design capacity.
该公司将持有Telstra的固网基础设施,包括数据中心和国际海缆。
Assets will include Telstra's fixed-network infrastructure including data centers andinternational subsea cables.
诸如西非海缆系统WACS之类的电缆项目将南非与英国沿非洲西海岸连接起来。
Cable projects such as the West Africa Cable System link SA with the UK along the west coast of Africa.
与此同时,外铠钢丝具有与缆芯匹配的设计寿命,不会导致任何海缆性能的降低。
The outer wire has a design life matches the cable core that does not result in any decrease in cable performance.
该海缆能够传送相当于40,000个电话通道,是其前身TAT-7的十倍。
The cable was able to carry the equivalent of 40,000 telephone channels, a ten-fold increase over its predecessor, TAT-7.
即使现在全球几乎每个角落都已有物理连接,但海缆的建设速度并没有降低。
Even though nearly every corner of the globe is now physically connected,the rate of cable construction is not slowing down.
在未来5年,全球海缆制造商生产的海缆总长度将达到16350km,接近从伦敦到悉尼的距离。
In the next five years, the world's cable makers will produce a total length of 16,350 kilometers(km), nearly the distance from London to Sydney.
为了增加冗余,2008年BICS通过其合作伙伴Omantel投资了EIG(欧洲印度网关)海缆系统。
To add physical redundancy,in 2008 BICS invested in the EIG(Europe India Gateway) cable system through their partner Omantel.
而亚洲-非洲-欧洲海缆(AAE-1)的故障将于1月22日开始进行维修,并预计于1月27日完成。
Meanwhile, the problem with the Asia Africa Europe(AAE-1) cable, which faced disruptions last month, will be fixed between January 22 and January 27.
问题不会消失,尤其是出于经济目的而增加使用海床,包括管道,海缆和海上风电场。
The problem isn't going to go away, especially with increased use of the sea floor for economic purposes, including pipelines,sea cables and offshore windfarms.
一旦完成,该海缆系统将通过提供更快的速度和显著提高的可靠性,加强与快速增长的东南亚市场之间的联系。
Once complete, the cable system will strengthen links between Australia and fast-growing South East Asian markets by providing faster speeds and dramatically improved reliability.
除了为新建海底光缆系统提供整体解决方案外,华为海洋还提供现有海缆系统的扩容解决方案。
In addition to providing the whole solutions for new build submarine cable systems,Huawei Marine also offers upgrade solutions for existing submarine cable systems.
The cable is approximately 18,800 kilometres long, and provides the primary Internet backbone between South East Asia, the Indian subcontinent, the Middle East and Europe.
Elites from submarine cable industry gathered discussing the new technology and direction of the industry, and exploring innovative ways and legislation to protect cable.
中文
Bahasa indonesia
日本語
عربى
Български
বাংলা
Český
Dansk
Deutsch
Ελληνικά
Español
Suomi
Français
עִברִית
हिंदी
Hrvatski
Magyar
Italiano
Қазақ
한국어
മലയാളം
मराठी
Bahasa malay
Nederlands
Norsk
Polski
Português
Română
Русский
Slovenský
Slovenski
Српски
Svenska
தமிழ்
తెలుగు
ไทย
Tagalog
Turkce
Українська
اردو
Tiếng việt