Examples of using Construction documents in English and their translations into Chinese
{-}
-
Political
-
Ecclesiastic
-
Programming
Construction documents phase.
Phase III(15%), construction documents.
I am looking for the standards on a full set of construction documents.
Generate construction documents using both electronic and non-electronic media.
(d) Incomplete or poorly coordinated construction documents;
Once the design and construction documents are completed, Skanska prepares a guaranteed maximum price proposal.
Cost estimates for the design development and construction documents phases.
The construction documents were received in January 2008, which enabled the United Nations to hire a local architect to continue the work.
Cost estimates for the design development and construction documents phases.
Additional progress was made on the design and construction documents, and plans are at an advanced stage for the reoccupation of the Secretariat Building.
Expenditures for the period 2003-2006 for the design development and construction documents phases.
Development of detailed design and construction documents will be based on the results of these studies.
Expenditures for the period 2003-2006 for the design development and construction documents phases.
The construction documents phase will follow, in which the final drawings and specifications to be used for bidding and construction will be prepared.
Expenditures for the period 2003-2007 for the design development and construction documents phases.
In its view, there was a risk that the construction documents may contain inconsistencies or inefficiencies, which in turn may create delays and cost overruns for the project.
Expenditures for the period 2003-2006 for the design development and construction documents phases.
Expenditures for the period 2003-2010 for the design development, construction documents and construction administration phases and for pre-construction services and construction Jan-July.
This amount consists of $7,458,000 for the design development phase and$17,802,000 for the construction documents phase.
The current progress of work indicates that the construction documents phase will be completed by late 2006.
The design development phase wasoriginally anticipated to be completed in 2004 and the construction documents phase by the end of 2005.
Six of the contracts relate to the design development, construction documents and construction administration phases of the capital master plan and one relates to programme management services.
This brings the total projectedexpenditures for the period 2003-2007 for the design development and construction documents phases to $193.7 million.
Details on the projected costs of the design development and construction documents phases are provided in tables 2 and 3 of the progress report.
This brings the total projectedexpenditures for the period 2003-2007 for the design development and construction documents phases to $193.7 million(see table 6).
A Reflects the cost of hiring an externalarchitectural consultant firm to produce detailed construction documents, perform construction administration duties and assume the responsibility of architect of record.
However, in the light of the new strategic options being recommended in the present report,the initiation of the construction documents phase will likely occur in early 2006.
(a) Design and preparation of the construction tender and construction documents(January to December 2004);
Information is directly exchanged with the 3D model,helping to ensure that your construction documents are accurate, consistent, and up-to-date.
During his tenure with LRK, he was responsible for maintaining the Hampton Inn prototype drawings andproducing construction documents for many new development hotel projects.