Examples of using Waste facility in English and their translations into Croatian
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
This is a toxic waste facility.
Toxic waste facility. Okay. GPS voice: Calculating.
When her body was found at a county waste facility.
Well, the hazardous waste facility That they destroyed was named in a class-action suit.
When her body was found at a county waste facility.
A waste facility shall only start the closure procedure if one of the following conditions is satisfied.
Name of operator and address of the waste facility.
It is necessary to define when and how a waste facility servicing the extractive industries should be closed and to set out the obligations and responsibilities to be met by the operator during the after-closure period.
On top of an industrial trash heap. We're holding it in an abandoned medical waste facility.
We're holding it in an abandoned medical waste facility on top of an industrial trash heap.
Suitable arrangements are made for the rehabilitation of the land and the closure of the waste facility;
Mayor Topbaş and his delegation will participate in the opening of Lahore Solid Waste Facility, where Istanbul Metropolitan Municipality provides information and technology support.
The waste facility is suitably constructed, managed and maintained to ensure its physical stability and to prevent pollution or contamination of soil, air, surface water or groundwater in the short and long-term perspectives as well as to minimise as far as possible damage to landscape; c.
Where there are substantial changes in the operation of the waste facility or the waste deposited;
In cases and at a frequency to be determined by the competent authority, the operator shall report, on the basis of aggregated data, all monitoring results to the competent authorities for the purposes of demonstrating compliance with permit conditions andincreasing knowledge of waste and waste facility behaviour.
Iv putting topsoil back in place after the closure of the waste facility or, if this is not practically feasible, reusing topsoil elsewhere;
The competent authority shall, prior to the commencement of any operationsinvolving the accumulation or deposit of extractive waste in a waste facility, require a financial guarantee e.g.
A waste facility may be considered as finally closed only after the competent authority has, without undue delay, carried out a final on-site inspection, assessed all the reports submitted by the operator, certified that the site has been rehabilitated and communicated to the operator its approval of the closure.
For the purposes of this Directive,the competent authorities shall classify a waste facility as Category A in accordance with the criteria set out in Annex III.
In cases and at a frequency to be determined by the competent authority, and in any event at least once a year, the operator shall report, on the basis of aggregated data, all monitoring results to the competent authorities for the purposes of demonstrating compliance with permit conditions andincreasing knowledge of waste and waste facility behaviour.
Prior to the commencement of disposal operations and at regular intervals to be decided by the Member State concerned,the competent authority shall inspect any waste facility covered by Article 6 in order to ensure that it complies with the relevant conditions of the permit.
At a frequency to be determined by the competent authority, and in any event at least once a year, the operator shall report, on the basis of aggregated data, all monitoring results to the competent authorities for the purposes of demonstrating compliancewith permit conditions and increasing knowledge of waste and waste facility behaviour.
The operator of a waste facility servicing the extractive industries should be required to lodge a financial guarantee or equivalent in accordance with procedures to be decided by the Member States ensuring that all the obligations flowing from the permit will be fulfilled, including those relating to the closure and after-closure of the waste facility. .
Prior to the commencement of deposit operations and at regular intervals thereafter, including the after-closure phase, to be decided by the Member State concerned,the competent authority shall inspect any waste facility covered by Article 7 in order to ensure that it complies with the relevant conditions of the permit.
Member States shall ensure that, in the event of an accident involving a waste facility as referred to in paragraph 1, information provided by the operator to the competent authority pursuant to Article 6(4) is immediately forwarded to the other Member State in order to help minimise the consequences of the accident for human health and to assess and minimise the extent of the actual or potential environmental damage.
Weak acid dissociable cyanide" means cyanide and cyanide compounds that are dissociated with a weak acid at a defined pH; 14"leachate" means any liquid percolating through the deposited waste andemitted from or contained within a waste facility, including polluted drainage, which may adversely affect the environment if not appropriately treated;
Save where the competent authority decides to take over such tasks from the operator, after a waste facility has been finally closed and without prejudice to any national or Community legislation governing the liability of the waste holder, the operator shall be responsible for its maintenance, monitoring and control in the after-closure phase for as long as may be required by the competent authority, taking into account the nature and duration of the hazard.
These particular requirements should not apply to those waste facilities from the extractive industries falling within the scope of Directive 96/82/EC.
Only a small number of facilities covered by this Directive have apparently been reported as extractive waste facilities.
The information available focuses on technical and scientific issues but there is,for example, no public directory of extractive waste facilities.