Examples of using Bula in English and their translations into German
{-}
-
Colloquial
-
Official
-
Ecclesiastic
-
Medicine
-
Financial
-
Ecclesiastic
-
Political
-
Computer
-
Programming
-
Official/political
-
Political
Barangays==Bula is politically subdivided into 33 barangays.
The team was led byMichael Bader andsupported by Kathrin Strauband Olivier Bula.
Did the company BULA- Piotr Bula achieve good results?
Guest accommodation Offering views of the countryside and sea, Tenuta Valle Bula produces olive oil.
As females he had Minika and Bula both were of the"Mitrovacka" line, with quite a long muzzle and with less expressed stop.
People also translate
The restaurant offers well-reviewed cuisine, while Bula Bar serves wine, beer, and cocktails.
With a combination of flotation and leaching,the overall gold recovery was 89% for the Mato Bula sample.
This variable is generally identical with$BULA in$HBRUTTO but without pooling Rheinland-Pfalz/Saarland(from 2000 on) and without differentiating between East and West Berlin.
The team was lead by Oliver Gnehm(Partner) and furthermore included Jürg Locher(Partner),Olivier Bula(Senior Associate) and Bastian BlankAssociate.
The Mato Bula gold-copper and Da Tambuk gold projects are both part of the company's 100% Adyabo project, located in the Tigray national regional state of Ethiopia.
Tobias Staehelin will be proposed for election to the Board of Directors at the Shareholders Meeting of March 16, 2017,and Patrice Bula will be proposed as a new member of the Compensation Committee.
The coding of the variables identifying the federal state($BULA, Bundesland) in which a household was included, is now consistent with the coding of the official statistics.
As announced in East Africa's news release dated August 16, 2018,the Company received MoMPNG approval for the ESIAs for the Mato Bula Gold Copper and Da Tambuk Gold Projects.
Have fun in the Bula Park, a unique place in Poznań, where games enthusiasts can take advantage of the outdoor bowling or play Pétanque- a French game little known in Poland.
At Adyabo, four diamond drill holes have been completed at each of the Da Tambuk and Mato Bula deposits, to detail the main core area of mineralization of existing I ndicated R esource s.
East Africa has submitted the Mato Bula and Da Tambuk Mining License applications to Ministry of Mines, Petroleum, and Natural Gas(the"Ministry of Mines") See Press Release dated December 13, 2017.
East Africa Metals Intersects 20 metres grading 4.7 grams per tonne gold and 4.7 grams per tonne silver at Da Tambuk, c ontinues i ntersecting high grade gold intervals during infill drilling in Ethiopia;identifies extension to mineralization at Mato Bula.
It all started on a smallscale: With just three employees, Heinz Bula and Gerhard Vogel founded"DESIGNA-Deutsche Signal- und Werbemittelgesellschaft mbH" in Kiel on 11th January 1951.
Mato Bula, Terakimti, and Da Tambuk are located within 10 km of existing paved highways and the National power grid, and approximately 35 km from the town of Shire, which has an airport and extensive services.
The proceeds will be used for ongoing technical, permitting and exploration expenditures as the Company prepares to advance the Terakimti Oxide Gold Project to the development stage,and prepare the Mato Bula and Da Tambuk deposits for mine permitting.
East Africa Metals completes Mato Bula infill diamond drill program, most recent intersections include 12.60 metres grading 12.59 grams per tonne gold, 0.66% copper, and 1.5 grams per tonne silver.
The Company's current resource base i n Ethiopia comprises 926,000 gold equivalent ounces in the indicated category plus 860,000 gold equivalent ounces in the inferred category(see table below and news release dated Ju ne 29, 2016) from Terakimti, Mato Bula and Da Ta m buk.
At Mato Bula, mineralization occurs in three sub-parallel zones with a strike length of 850 metres in a northeast-southwest direction, a vertical extent of up to 450 metres and a horizontal width of up to 80 metres.
Minor variance may occur due to QAQC interval adjustments. Work in2017 will focus primarily on continued resource delineation drilling at Mato Bula and Da Tambuk, and will include testing gold surface exploration targets not yet drill tested on the Adyabo Project.
At Mato Bula, three holes were drilled to test: 1 near surface mineralization on the southern extension of Jasper Hill(WMD035 intersected 0.90 metres at 14.50 grams per tonne gold and 0.10 percent copper); and 2 the down plunge position of the main shoot at Silica Hill.
This work will be c oncurrent with on-going development review and assessment at Terakimti,Mato Bula, and Da Tambuk(see positive Preliminary Economic Assessment study(" PEA") news release April 30, 2018) in the Federal Democratic Republic of Ethiopia" Ethiopia.
Based on these test results it is envisioned that a process utilizing conventional crushing and grinding followed by flotation to produce a gold rich copper concentrate, combined with agitated leaching of flotation products in a C.I. L or C.I.P. circuit,would be appropriate technology for the recovery of gold and copper at Mato Bula.
Both the kilometre-scale key trends(Mato Bula and Da Tambuk) remain permissive to the discovery of additional mineralized gold lodes through more advanced targeting, following receipt of the complete set of drill results in the coming months.
The exploration objectives described in this release a re aimed to increase and upgrade the resource along strike, to depth, and through definition drilling, while the development agenda described in the Terakimti,Da Tambuk and Mato Bula Preliminary Economic Assessments(see press release April 30, 2018) will, once successfully executed, continue to de-risk the project as the Company works towards its objective to establish operations and cash flow.