Examples of using Double track in English and their translations into German
{-}
-
Colloquial
-
Official
-
Ecclesiastic
-
Medicine
-
Financial
-
Ecclesiastic
-
Political
-
Computer
-
Programming
-
Official/political
-
Political
Kurt did a double track.
Double track from Bowa latest cordless technology.
Self-adhesive, double track, with markings.
The curve of Alp Grüm in 2010 double track.
Self-adhesive, double track, without markings.
Double track railroad bridge in clear autumn day.
Self-adhesive, double track, without markings.
Total railway track length is 3,808 km ofwhich 3,533 km single track and 275 km double track.
The double track to Gothenburg makes commuting easy.
Construction standards===The route is double track and electrified throughout.
Whether single or double track, with or without electrical assistance, expert Arne Behrensen of cargobike.
Epoch IV(H0)• Epoch III(N) 272458 170630 Road Foil,Flexible Self-adhesive road foil, double track, with markings.
Noch Tunnel portal double track 1 pc, 58072- train models online store.
Any line, where the centers connect with their right hands,left hand ocean-wave, double track For Basic and Mainstream additionally.
Double track planned In order to reduce pressure on the overstretched Allmend-Horw section, the SBB is now planning to double it.
Today the line is at least double track and electrified for its entire length.
The Württemberg Southern Railway, running via Biberach(Riss),Aulendorf and Ravensburg to Friedrichshafen is a double track and non-electrified line.
The DVDs in America do not contain a double track(Eng/JP) and are the censored version….
Intermittent motion, double track BREITNER linear filling machines with an output of up to 200 containers/minute and container sizes from 20 ml to 5 liters.
Current situation==The section from Dortmund to Lünen is double track, electrified and classified as a main line.
The Voreifel Railway() is a partly double track, non-electrified main line in the Voreifel from Bonn to Euskirchen in the German state of North Rhine-Westphalia KBS 475.
Display rules enabled the tunnel design to automatically shift between single and double track based on the distance between tracks. .
The Berlin outer ring(, BAR)is a 125 km long double track electrified railway, originally built to bypass West Berlin during the division of Germany.
The main line from Duisburg Hauptbahnhof via Duisburg-Hochfeld Süd andHohenbudberg to Mönchengladbach Hbf is now consistently double track and electrified.
Of course there can be some of the net alone, Double track but driving is a bit out of the drawers are placed very far down….
The Follo Line Project is currently the largesttransport project in Norway and includes the country's longest double track railway tunnel 20 km.
Within stations with just one block interface(per double track route) entrance and exit track correspond to the track with the same default direction.
The double track has been replaced, except between Evesham and Worcester(Norton Junction) in 2011, and freight services are planned to re-use this route.
On average, around 40% of lines were electrified in both Cohesion countries and Objective 1 regions in 2001;only 24% of lines were double track in Cohesion countries and only just over 13% in Objective 1 regions.
This major contract is the second in a row for the Chinese Ministry of Railways, and one of the most prestigious and largest projects in Getzner's history. The new railway will provide an efficient connection between the Chinese capital Beijing and Shanghai, China's most important industrial centre.The 1,300 kilometre double track is roughly four times the distance of the rail link from Bregenz to Vienna.