Examples of using Mooser in English and their translations into German
{-}
-
Colloquial
-
Official
-
Ecclesiastic
-
Medicine
-
Financial
-
Ecclesiastic
-
Political
-
Computer
-
Programming
-
Official/political
-
Political
View From Mooser Aim!
Transport andmobility Bodywork Kantonsstrasse 3929 Täsch Christoph Mooser Tel.
Here Jakob Mooser could fall back on in-house know-how.
The vibrating beam was equipped with Mooser pneumatic vibrators.
Sandra Mooser works in the field of adult education an is a doctoral student at the Institute of Social Anthropology, University of Bern.
Playgrounds for children- Mooser Waldile Gemeinde Sexten, Dolomitenstr.
Mooser vibrators were also operated for the tunnel constructions"Kupfereck" and"Frauenberg", which are situated at the same DB railway line.
Through the woods on the"Mooser field" in the village Litzlberg.
Mooser vibrators were mounted onto the BFD mounting clamp, so that they could be shifted and relocated at the formwork easily and quickly according to the pouring process.
Thanks to the wall thickness of only 30 cm,it was sufficient to mount the Mooser formwork vibrators only at one side of the formwork.
Both companies- Jakob Mooser GmbH Egling and Mooser EMC Technik GmbH Ludwigsburg- have globally valid accreditation.
At the tunnel construction Radfeld-Mitte, which serves as supply railway tunnel for the Brenner Base Tunnel, Mooser vibrators were operated onto a Doka formwork system for the open-cut circular profile.
Jakob Mooser GmbH Egling and Mooser EMC Technik GmbH Ludwigsburg are legally independent firms which cooperate closely with each other.
For the construction of the tunnel floors in the main tunnel, Mooser Schwingungstechnik manufactured vibrating beams with various radii for the different sections.
Mooser EMC Technik GmbH was founded in Ludwigsburg in 2006 as an affiliate of Jakob Mooser GmbH, established in Egling near Munich in 1989.
The concrete was compacted only with help of Mooser VR57K vibrators, which were mounted onto the steel segments of the formwork via plates.
Mooser staff was in Sochi in order to advise the employees of the russian company Tunnel Destroy in the concrete compaction with Mooser formwork vibrators.
This is the first time we have beenable to measure anything on this scale," said Andreas Mooser, primary author of the study and a member of Professor Jochen Walz's research team at Mainz University.
In 2009 Mooser GmbH has expanded its service portfolio towards EMC testing on Hybrid, Electric and Fuel Cell drive train components for the automotive segment.
The cathedral can look back over 600 years of history, and houses famous masterpieces such as the incomparable stained glass windows by Jozef Mehoffer and Alfred Manessier andan organ by Aloys Mooser.
At the A16 highway, Mooser VR57K vibrators had been at work onto a steel formwork system of the company Jörimann for the concrete compaction of the tunnel Sous le Mont.
On the development of the companies: After 12 years of being responsible for EMC in a major Munich company, Jakob Mooser founded Jakob Jakob Mooser GmbH in the summer of 1989.
Mooser the EMC lab for global automotive applications, railways, industry, armed forces and all areas of electrical engineering wherever electromagnetic compatibility is significant.
For the concrete compaction of the 14m high and22m long chamber walls the company Mooser delivered also internal vibrators with special hose lengths of 14m and the related frequency converters for operating the total amount of 30 pcs of internal vibrators.
Mooser EMC Technik GmbH and Albatross Projects GmbH have received very positive feedback for their presentation about EMC tests for innovative automotive drive systems at the Asia-Pacific EMC Week in Beijing.
In a 90-minute presentation, Jakob Mooser(CEO Mooser EMC Technik GmbH) and Timo Greiner(CEO Albatross Projects GmbH) explained the general conditions for successful EMC testing in electro, hybrid and fuel cell drive systems.
Mooser performs testing according to the company standards of all car manufacturers in Europe, USA and Asia, aviation standards, generally used military and commercial standards and the Directives of the European Union.
At the Ludwigsburg location, Mooser EMC Technik GmbH operates, on more than 2 000 m², ultramodern absorber and shielding cabins, measuring stations and simulation systems- a testing lab as currently no other manufacturer-independent service provider will have.
For concrete compaction at Felderhaldetunnel, Mooser VR56 external vibrators were operated onto a counter formwork in the open section and at the tunnel entrances, as well as Mooser VR57 vibrators onto the inner side of a steel formwork system of the company Domesle Stahlschalungen.
Lured along a gentle brook and up the Mooser Steg Trail to steep rocky slopes. Impressive rockslide forests and the Gasthof Moosalm inn at 1,500 m above sea level with its breathtaking views and hearty“marend” or lunch complete the expedition of the senses.