Examples of using Input instruction in English and their translations into Japanese
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
-
Programming
Zero or more input instructions.
Input instruction master Class.
Jumps to the Input Instruction Table.
Input Instruction Represents the item that is input to this process.
Specifying Versions of input instructions K.
Master input instructions(old Asprova).
The process 70is a merging process in which there are multiple input instructions.
The input instruction of the next order will also be included.
K: Merging process, next resource constraint,specifying versions of input instructions.
Demand: Summary of input instruction quantity on this day.
InputInstructionList property returns a list of all input instructions of this item.
You can also input instructions related to overall design.
When no instructions are specified, only master input instructions will be generated.
Master input instructions which specify this item as the final item code.
J Inventory(fluctuation) If the quantity is a positive value,the inventory increases(an input instruction is created).
It is also possible to input instructions related to overall design.
For example for purchase orders, the site of the manufacturing/inventory order of the input instruction is the supplier.
If intermediate items are auto-generated, creates master input instructions and master output instructions using the items.
Specify only one process each for finished items and manufactured parts in the Integrated Master andSpecify the Master input instruction.
To solve this problem, the INPUT instruction has a feature for displaying a guidance message.
In Step S11, the input instruction of"IN" or"OUT" of the course is made by the input pen 3.
As in the following settings, if Time constraint MIN is set for all input instructions, Time constraint MAX can be set for each input instruction.
Items, master input instructions, master output instructions, and master use instructions that are referred to by operations will not be deleted.
Quantity of the input instruction=(Quantity of the operation* Required quantity of the input instruction+ Scrap quantity of the input instruction)*(1/ Yield of the input instruction).
(Production quantity* Required quantity of the master input instruction+ Scrap quantity of the master input instruction)/ Yield of the master input instruction.
To set the master data for using MRP,specify the master input instruction(and master output instruction if necessary) in the Integrated Master for finished items and manufactured parts, as well as required quantities and connection between items.
When the time constraint method is SSEE andthe input-output ratio is entered in the Setup field of the input instruction of the next process, the start and end of the production in the previous process and the start and end of the setup of the next process will be related.