Examples of using Completion time in English and their translations into Korean
{-}
-
Colloquial
-
Ecclesiastic
-
Ecclesiastic
-
Programming
-
Computer
Completion time: 2014.
Remember this is a final check-in completion time.
Expected completion time is 2 minutes.
Rapid return on investment Minimum cost and completion time of new plant.
Scheduled completion time is 18 months.
Research and revisions. You will own full copyrights. Completion Time: 16.
Their standard completion time varies from 3.5 to 4 years.
Scheduling theorists call this metric the“sum of completion times.”.
The completion time of the whole action will be controlled within 1.5 seconds.
Ultra fast cooling, ice sand production completion time is less than 90 minutes.
Average completion time for students who have never studied Korean is 80 to 160 hours.
Depending on the institution, the cost and completion time for the program will vary.
Program Overview 15 credit hours Coursework is completed online Prerequisite:bachelor's degree Completion time varies.
Average Time: The average completion time for all submitted test attempts.
The Nike+ FuelBand is a wristband that tracks movement,calorie intake, and completion time for specific tasks.
All these advantages contribute to faster completion times, to standardise the quality of training based on European EASA requirements.
Program Overview 18 credit hours Coursework completed online Prerequisite:Bachelor's degree Completion time is approximately one year.
Drawing of product Size specifications Quantity desired Desired completion time of order You will receive a return response with the information requested.
My test scan took only 90 seconds to run andthe detailed log provided scan speed, number of files skipped, and exact completion time.
Our company will ensure the consistence of completion time and contracted time. .
Newby-Clark, I. R. et al. People focus on optimistic scenarios and disregard pessimistic scenarios while predicting task completion times.
GB drives were used for the screen shots in this article, so the Estimate Time/ Completion Time is much lower than it would be if 2 and 3TB drives are used.
Using Versiv and LinkWare Live, Extreme Packets has significantly reduced overall project completion time by as much as 70%.
Cost efficient: First class material,reasonable price, once and for all investment, low requirements for base and short completion time make it cost efficient.
One time completion for backing, filling and capping.
The amounts shown above include costs for the entire program, assuming normal time to completion.