Examples of using Waste incinerators in English and their translations into Polish
{-}
-
Official
-
Colloquial
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Financial
-
Official/political
-
Programming
-
Computer
Waste incinerators; and.
Fewer than half of these plants(39%)are dedicated waste incinerators.
Incinerators, waste incinerators, combustion of wood scraps.
This is true also for the heat produced by waste incinerators.
Municipal Waste Incinerators- 40 C.F.R. Part 60, Subpart E, Subpart Ea and Subpart Eb;
Operating and Emission Guidelines for Municipal Solid Waste Incinerators.
High temperature processing: Waste incinerators, iron and steel plant furnaces, coal-fired boilers, asphalt plant and electric arc furnace etc.
Certain types of RDF waste can also be disposed of in municipal waste incinerators, which operate at a lower temperature.
The change in the procedure for granting RIPOK status has fundamentally modified the legal status andscheduling of performance of contracts for construction of communal waste incinerators.
It has been estimated that 50 to 60% of municipal waste incinerators in the EU will meet the new energy efficiency criteria of the WFD.
Seek to issue recommendations on how the Directive can achieve its goal ofdiverting waste electrical and electronic equipment from waste incinerators and landfills;
In the data collection exercise data on dedicated waste incinerators and cement and lime kilns co-incinerating waste have been gathered from the respective industry organisations.
Therefore, by applying an energy efficiency formula, only the most energy-efficient municipal waste incinerators will be classified as recycling plants.
The Parties to the Protocol of the Convention on Long-Range Transboundary Air Pollution on Persistent Organic Pollutants opened negotiations in 2007 with a view to improving further the protection of human health and the environment, including through the updating of the list of substances concerned andthe emission limit values applicable to certain waste incinerators.
Of the Environmental Protection Law, an integrated permit is required for"conducting"(prowadzenie)certain installations, including communal waste incinerators with a processing capacity exceeding the thresholds set forth in the regulations.
A broker and distributor of new and used recycling equipment, including tub grinders, tire shredders, plastic equipment and granulators,soil remediation, waste incinerators, screens, and balers.
Typical examples of such public infrastructure are airports, railways,roads, bridges, tunnels, environmental facilities(such as waste incinerators and water treatment plants) and public buildings including government offices, schools, hospitals and prisons.….
The amendments introduced include further requirements for reductions of dioxins, furans andPCBs by setting emission limit values for example for waste incinerators, sinter plants and secondary steel plants.
For the foregoing reasons, under the Waste Act and the Environmental Protection Law, exploitation of certain communal waste incinerators indisputably requires obtaining an integrated permit, but the stage of hot start-up tests is not exploitation and does not require an integrated permit.
This in turn forces a shift in the date the tests are conducted as compared to the schedule drawn up on the basis of the regulations existing as of the date of conclusion of the construction contracts for waste incinerators currently being built, which may result in delay of the work.
The assessment of the implementation of theWID has indicated that, whilst the Directive has brought significant improvements in the control of waste incinerators across the EU, several issues require further action.
Especially important for power stations and waste incinerator operators.
A steam pipe was built between the waste incinerator and the paper mill.
Wastes incinerator, coal fired boilers, fluid fluidized bed boiler flue gasfilter etc.
Budownictwo ogólne i przemysłowe, infrastruktura komunikacyjna,energetyka i ochrona środowiska- Installation of two boilers and equipment at the waste incinerator DS Smith in the United Kingdom.
Containers Analysis and plant operation with GBT Especially important for power stations and waste incinerator operators.
But it is hard to find any justification for introducing a requirement that a waste incinerator has to have an environmental permit in place at the stage of conducting start-up tests, as it would have to have during the operational stage.
For example, in one of Lithuania's towns,business people who want to build a waste incinerator are misleading the public by maintaining that the incineration of waste is the same as or better than other methods of waste management, such as avoidance and sorting.
The most important contracts of the previous year include the Pruszkow Velodrome, the Bridge in Pulawy, the Bridge on the Pisa River, Electrofilters at Zaklady Azotowe in Pulawy and EC Siekierki in Warsaw, the roofing of platforms at the Polonia Stadium in Warsaw(in Poland),the installation of waste incinerator boiler in Moerdijk, the Netherlands, the installation of a boiler in Ornskoldsvik, Sweden, the assembly of a boiler in Permnitz, Germany,(abroad) and many others.
