Examples of using UNEN in English and their translations into Russian
{-}
-
Official
-
Colloquial
Creation of the automated system of monitoring of voltage in UNEN.
The UNEN includes networks belonging both to the“FGC UES” JSC and to other owners.
The system of the continuous control over pressure in UNEN is developed.
Thus for the telephony organisation between CCN and objects UNEN channels of satellite and cellular communication statements have been used.
Organizing electricity modes andelectrical energy balances calculation at the UNEN;
ASTC was based on base of General Information Model UNEN(CIM) and Models of Information Interaction IEM.
Losses of the electric power in new borders of the company(including networks UNEN) made 4,92.
For the accounting period- 2006- on networks UNEN in the adjacent states the electric power was transferred in balance expression of 14 792,345 million kw-h.
To elaborate the Program andto implement measures for technological losses reduction within the UNEN;
For actualisation of settlement model of UNEN calculations of parametres of the power equipment of networks 330 kv and above are executed, works for networks 220 sq were begun.
Work on consideration and the coordination of the documentation on property complexes UNEN was spent.
In 2006 the Program of increase of reliability and observability UNEN by equipment of substations by monitoring and management complexes by technological processes is developed and confirmed.
Such procedure allows not to suppose deliveries of the poor-quality orunmodern equipment to objects UNEN.
To develop and to implement the scientific& technical policy at the«FGC UES» JSC and the United national(all-Russian)electricity network(UNEN), in order to introduce advanced equipment and innovative technologies.
The Group's primary activity is the provision of services for the transmission of electric power via the Unified National Electrical Network“UNEN”.
A complex of works performed, to identify priority areas of controllable lines technology anddevices introduction in the UNEN, technical requirements to main equipment types elaborated, equipment models created and tested.
The methodology of payment of losses did not vary, and as base was used balancing issue from grid of JSC«FGC UES»(MGC)in a network attached consumers to UNEN.
To continue realizing the Program of revision andelaboration of normative& technical references for UNEN operation, including more than 270 key industrial documents, with not less then 40 documents to be completed in 2005;
On NWMEC JSC«FGC UES» started to carry out separately payment of volumes of electric energy and the capacity,actual losses got for the purpose of indemnification in UNEN.
The purposes and problems of activity of JSC«FGC UES»as the company, which organized the management of UNEN, fixed in the Federal law«About electric power industry», caused a number of features of structure of management of JSC«FGC UES», found reflexion in charters of JSC RAO"UES of Russia" and JSC«FGC UES».
Verification, the coordination of one-linear schemes of the organisation of the commercial account on UNEN and to old section of JSC«FGC UES».
It was defined"narrow" places in networks 220 kv and above,imposing restrictions on a mode of transfer of capacity on UNEN, the continuous control of their loading with the subsequent analysis flow distribution in difficult areas for timely working out of actions for normalisation of operating modes of networks is organised.
The total is transferred in Department of development of services and reliability of a network of JSC«FGC UES»for formation of summary balance as a whole on UNEN for the accounting period.
Besides, for maintenance of operatively-dispatching management with objects of UNEN belonging MGC, and also with a view of decrease in quantity of the technological infringements occurring owing to errors of operation personnel, improvement of observance of the schedule of switching-off for repairs and equipment Sb,decrease in losses in UNEN there is begun formation of control centres by networks(CCN) in structure of branches MES.
In October 2003, the«FGC UES» JSC decided to improve theoperating& dispatching management system, as an integral part of the common mechanism of the UNEN effective operation technology management.
For increase of observability UNEN 220kv according to the Plan-schedule of formation of Control centres networks in branches of JSC«FGC UES»- PMGC and RGC(joint-stock company-energo) in 2006 develop the program of modernisation and expansion of systems of telemechanics and an information transfer of objects UNEN, by being 2nd stage of the Program of increase of reliability and observability ЕНЭС by equipment of substations by monitoring and management complexes by technological processes.
Since 2006 according to requirements of Rules of nondiscrimination access by payers of services of JSC«FGC UES» became the distributive network companies,connected to UNEN, and large consumers, instead of the marketing companies.
In 2007 is planned to continue works: on designing of a basic switching telephone system of electric power industry: to develop the contract design, technical requirements to STSE, andalso to continue modernisation of telephone exchanges at the enterprises and substations UNEN.
The«Development scheme of the United national electricity network of the UPS of Russia, of 220 kV and higher, for the period of 2003 to 2012", concretizing goals, objectives andkey lines of the long-term 10-years' UNEN development program, as determined by the UNEN development Strategy approved in 2003 by the Board of Directors of the“FGC UES”.