Examples of using Valid building in English and their translations into Slovak
{-}
-
Colloquial
-
Official
-
Medicine
-
Financial
-
Ecclesiastic
-
Official/political
-
Computer
-
Programming
Valid building permit for completing wellnes and accommodation capacities.
This great land is sold with a valid building permit and started work.
Together with the land is also solda project for a 4-room family house, already with a valid building permit.
The builder has a valid building permit,“ said the city spokeswoman Szabóová.
Land area is 550 m² and is used as a garden,and has a valid building permit.
The project itself has a valid building permit, and the villa is sold exclusively completed.
Activities during construction planning proceedings through a valid building permit.
The hotel has a valid building permit and certificate of occupancy, energy certificate B.
Total living area of the house, by the valid building permit, is 128 m2 net area.
The villa has a valid building permit for raising an additional floor, the total residential area of about 110 m2.
Design and engineering activities that result in valid building permit and trial operation.
For this property a valid building permit has been obtained and all utilities have been paid.
It covers both existing buildings andbuildings before completion provided that the candidate has obtained a valid building permit for it.
The house has access to the car and a valid building permit has been issued for lifting another floor of 50m2.
If a valid building permition is issued, commencing of the construction is normally within 12 days after signing the contract.
Description Project- building site on sale with the valid building permit in the 1 st row by the sea on island Brac!
The land has a valid building permit for the construction of a family house, gross area of 230 m2, distributed on the ground floor and first floor.
The Group specializes in ready-to-build projects that have a valid building permit, mainly in regional towns in Slovakia.
In addition, this flat has a valid building permit for glazing one or both terraces, which creates the possibility of creating a winter garden.
Sea distance(m)- 65 Land Size-458 m2 Building plot of 468 m2 with valid building licence and all infrastructure dues paid,….
Description Building plot of 512 m2,with autochthonous Dalmatian house and auxiliary building for reconstruction(with a project and a valid building permit).
This is a building land plot with a valid building permit and the initiated construction of a residential building(17 sq m).
The Embassy has the right to renew the three-year lease under the same conditions, provided that it has atleast two months before the expiration of the lease period a valid building permit for the construction of a new US Embassy building in Slovakia.
The Embassy has the right to renew the three-year lease under the same conditions, provided that it has atleast two months before the expiration of the lease period a valid building permit for the construction of a new US Embassy building in Slovakia.
It shall cover both existing buildings andbuildings before completion provided that the candidate has obtained a valid building permit for it, save when the building has been designed in accordance with the specifications of the contracting authority;
If the subsidy is requested for construction or modification of buildings or construction works, a final decision on the building permit and if the applicant does not have a final decision on the building permit,a sworn declaration on the additional submission of a valid building permit, stating the deadline for its submission.
In terms of the park itself, Prologis Park Wroclaw V has an optimal location in the region andthe proposed plot had access to the necessary utilities and valid building permits, which made it possible to start development immediately and deliver on time,” says Ewa Zawadzka, vice president, head of land and development, Prologis Poland.
The Embassy has the right to renew the three-year lease under the same conditions, provided that it has atleast two months before the expiration of the lease period a valid building permit for the construction of a new US Embassy building in Slovakia.
