Examples of using Network code in English and their translations into Slovenian
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Financial
-
Computer
-
Official/political
-
Programming
The network code was created by the same people who are now engaged in its support.
Provide a reasoned opinion to the ENTSO for Gas on the network code in accordance with Article 6(7) of Regulation(EC) No 715/2009;
Network code and/or the standard conditions outlining the rights and responsibilities of all network users.
This Regulation establishes a network code which lays down the requirements for grid connection of:.
The advantage is that in Dota 2 problem with delays and lags between servers andoptimized network code meets the minimum.
Regulation establishing a network code on requirements for grid connection of generators(RfG).
The Commission is empowered to may adopt, taking account of the Agency's proposals, amendments to any network code adopted under Article 55 6.
Of XXX establishing a network code on electricity emergency and restoration, OJ[…].
Regulation(EU) 2015/703 of 30 April 2015 establishing a network code on interoperability and data exchange rules;
The network code and/or the standard conditions outlining the rights and responsibilities of all network users including:.
Regulation(EU) 2017/460 of 16 March 2017 establishing a network code on harmonized transmission tariff structures for gas.
ACER shall submit a draft network code prepared under this paragraph to the Commission and may recommend that it be adopted.
Commission Regulation(EU) No 312/2014 of 26 March 2014 establishing a Network Code on Gas Balancing of Transmission Networks. .
Where the Commission proposes to adopt a network code on its own initiative, the Commission shall consult ACER, the ENTSO for Electricity and all relevant stakeholders in regard to the draft network code during a period of no less than two months.
Commission Regulation(EU) 2015/703 of 30 April 2015 establishing a network code on interoperability and data exchange rules(Text with EEA relevance).
Where the ENTSO for Electricity has failed to develop a network code within the period of time set by the Commission under paragraph 6, the Commission may request the Agency to prepare a draft network code on the basis of the relevant framework guideline.
The Commission shall request the ENTSO for Electricity to submit a network code which is in line with the relevant framework guideline, to the Agency within a reasonable period of time not exceeding 12 months.
Where the Commission proposes to adopt a network code on its own initiative, the Commission shall consult the Agency, the ENTSO for Gas and all relevant stakeholders in regard to the draft network code during a period of no less than two months.
Where the ENTSOs fail to develop a network code the Commission may ask the Agency to prepare a draft network code.
Where the ENTSO for Gas has failed to develop a network code within the period of time set by the Commission under paragraph 6, the Commission may request the Agency to prepare a draft network code on the basis of the relevant framework guideline.
Commission Regulation(EU) 2017/459 of 16 March 2017 establishing a network code on capacity allocation mechanisms in gas transmission systems and repealing Regulation(EU) No 984/2013.
(5)The System operation guidelines 24 and the Network code on emergency and restoration 25 constitute a detailed rulebook governing how transmission system operators and other relevant actors should act and cooperate to ensure system security.
The Commission shall request the ENTSO for Gas to submit a network code which is in line with the relevant framework guideline, to the Agency within a reasonable period of time not exceeding 12 months.
Commission Regulation(EU) No 984/2013 of 14 October 2013 establishing a Network Code on Capacity Allocation Mechanisms in Gas Transmission Systems and supplementing Regulation(EC) No 715/2009 of the European Parliament and of the Council.